WELL · 42-469-31847 · DISTRICT 2

Dentler Daniel #1

Plugged

Victoria County · Mission Valley W. (Mass Wilcox) field  · Vertical

Dentler Daniel #1 (API 42-469-31847) is a plugged well in Victoria County, plugged May 23, 1985, last operated by Enterprise Resources Inc..

The RRC has issued 3 drilling permits between 1981 and 1984, permitted to 9,500 ft.

Completion filings report 4 formation tops, including Frio, Vicksburg, Yegua, Wilcox.

Operator of record

Enterprise Resources Inc.

Houston, TX · P-5 Y, filed Feb 15, 1986 · 67 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnterprise Resources Inc.
Production reportsnone
Latest permitEnterprise Resources, Inc.Aug 23, 1984
9,500
total depth, ft
3
permits on file
Aug 23, 1984
last permit issued
Jan 6, 1982
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 6, 1982
Shut in
—
Plugged
May 23, 1985

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
249534-99RecompletionEnterprise Resources, Inc.Aug 23, 1984Aug 23, 1984—9,500
215999-99RecompletionEnterprise Resources, Inc.Sep 28, 1983Sep 28, 1983—9,500
141258-99DrillBelcher, R. K. Inc.Nov 19, 1981Nov 19, 1981—9,500

Formation tops

As filed on W-2/G-1. Subsea from 212 ft elevation.Download CSV →

FormationMD ftSubsea
Frio3,262-3,050
Vicksburg3,800-3,588
Yegua5,202-4,990
Wilcox8,403-8,191

Perforations

Perforated and open-hole intervals.

FromToType
2,8572,861Perforated
3,1213,123Perforated
9,0129,018Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,00012.25450 S
2.3758,900——
4.59,2507.875890 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 21, 1984Aug 27, 1984—
00Sep 15, 1984Aug 27, 1984—
00Mar 7, 1984Oct 17, 1983—
00Feb 27, 1984Oct 17, 1983—
00Jan 12, 1984Mar 8, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46931847, documented in the API reference.