WELL · 42-469-31938 · DISTRICT 2

Keeran #17

Plugged

Victoria County · Keeran (7000) field  · Vertical

Keeran #17 (API 42-469-31938) is a plugged well in Victoria County, plugged December 20, 2008, last operated by Stone J. G. Oil CO..

The RRC has issued 6 drilling permits between 1982 and 1992, permitted to 7,078 ft.

Completion filings report 2 formation tops, including Catahoula, Greta.

Its 4 leases have reported 5.44K barrels of oil and 219 mcf of gas since January 1993, last reporting in July 2013.

Operator of record

Stone J. G. Oil Co.

Victoria, TX · P-5 Y, filed Aug 3, 2018 · 28 permits on file · (361) 935-0716

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStone J. G. Oil Co.
Production reportsAnaqua Oil & Gas, Inc.through Feb 1996
Latest permitStone, J. G. Oil Co.Apr 28, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,078
total depth, ft
6
permits on file
Apr 28, 1992
last permit issued
Apr 24, 1983
completed
5.44K
cumulative oil, bbl
219
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 24, 1983
Shut in
—
Plugged
Dec 20, 2008

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Keeran O-2-7824Keeran (5100)HK Energy Operating, LLC15.44K219Jan 1993 – Jul 2013
— G-2-130854——000—
— G-2-141400——000—
— O-2-7567——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Stone, J. G. Oil Co.Jan 1993 → Feb 1995
  2. 2Anaqua Oil & Gas, Inc.Mar 1995 → Feb 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
398458-99RecompletionStone, J. G. Oil Co.Apr 27, 1992Apr 28, 1992Apr 29, 19925,250
359014-99RecompletionStone, J. G. Oil Co.May 8, 1989May 10, 1989—7,078
268273-99RecompletionStone, J. G. Oil Co.Feb 28, 1985Mar 1, 1985—7,078
239472-99RecompletionStone, J. G. Oil Co.May 11, 1984May 21, 1984—7,078
194996-99RecompletionStone, J. G.May 13, 1983May 13, 1983—7,078
168632-99DrillStone, J. G.Aug 9, 1982Aug 9, 1982Aug 19, 19827,078

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-130854————
—— G-2-141400————
—— O-2-7567————
—— O-2-7824————

Formation tops

As filed on W-2/G-1. Subsea from 10 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula4,070-4,060
Greta4,860-4,850

Perforations

Perforated and open-hole intervals.

FromToType
5,0755,077Perforated
5,1345,137Perforated
5,9926,001Perforated
6,2216,223Perforated
6,2326,234Perforated
6,9146,933Perforated
7,0017,003Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,04212.25450 S
2.3756,152——
2.3756,912——
5.57,0687.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 1, 1992Aug 28, 1992—
00Oct 8, 1992——
00Jun 3, 1992—Yes
00May 4, 1990Feb 5, 1990—
00Mar 24, 1990——
00Aug 22, 1989May 22, 1989Yes
00Jun 8, 1989——
00Jun 7, 1985Mar 20, 1985—
00Apr 24, 1985——
00Jul 12, 1984May 29, 1984—
00Jun 30, 1984May 29, 1984—
00Jan 12, 1984Jun 29, 1983—
00Jan 12, 1984Jan 17, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46931938, documented in the API reference.