WELL · 42-469-32005 · DISTRICT 2

Traylor #3

Plugged

Victoria County · Heyser (6450) field  · Vertical

Traylor #3 (API 42-469-32005) is a plugged well in Victoria County, plugged March 29, 2011, last operated by Magnum Producing LP.

The RRC has issued 2 drilling permits between 1983 and 1984, permitted to 6,530 ft.

It was permitted by Broken Hill Pty Hldgs (USA) Inc. and has since transferred to Magnum Producing LP on the wellbore schedule.

Completion filings report 4 formation tops, including Catahoula, Greta, Sinton, Top Sinton.

Its lease has reported 2.58K barrels of oil and 14 mcf of gas since January 1993, last reporting in August 2011. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Magnum Producing LP

Permitted by Broken Hill Pty Hldgs (USA) Inc.; the EWA schedule now lists a different operator.

Corpus Christ, TX · P-5 Y, filed Dec 4, 2025 · 312 permits on file · (361) 446-2414

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMagnum Producing LP
Production reportsMagnum Producing, LPthrough Mar 2004
Latest permitBroken Hill Pty Hldgs (USA) Inc.Mar 30, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,530
total depth, ft
2
permits on file
Mar 30, 1984
last permit issued
Mar 5, 1985
completed
2.58K
cumulative oil, bbl
14
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 5, 1985
Shut in
—
Plugged
Mar 29, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Traylor O-2-6870Heyser (6450)Magnum Producing, LP22.58K14Jan 1993 – Aug 2011

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Magnum Producing & Operating Co.Jan 1993 → Jan 2004
  2. 2Magnum Producing, LPFeb 2004 → Mar 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
234013-99RecompletionBroken Hill Pty Hldgs (USA) Inc.Mar 29, 1984Mar 30, 1984—6,530
187407-99DrillPrior Exploration Company, Inc.Mar 1, 1983Mar 1, 1983—6,530

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-6870————

Formation tops

As filed on W-2/G-1. Subsea from 36 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula4,100-4,064
CatahoulaTOP CATAHOULA4,100-4,064
Greta4,870-4,834
GretaTOP GRETA4,870-4,834
Sinton6,440-6,404
Top Sinton6,440-6,404

Perforations

Perforated and open-hole intervals.

FromToType
4,2404,255Perforated
6,0286,031Perforated
6,4426,445Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,57212.25560 S
2.3755,974——
4.56,5307.875300 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 4, 1985Mar 11, 1985—
00Apr 3, 1985——
00Jun 14, 1984Apr 30, 1984—
00Jun 6, 1984Apr 30, 1984—
00Jan 12, 1984Jul 20, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
127K
bbl, all reported
Jul 2010
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000054969W-14 DisposalPlugged May 4, 2011004,100–4,300

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120092010

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46932005, documented in the API reference.