WELL · 42-469-32144 · DISTRICT 2

Urban Armour #3

Plugged

Victoria County · Gaffney S.E. (6100 Stray) field  · Vertical

Urban Armour #3 (API 42-469-32144) is a plugged well in Victoria County, plugged January 14, 1998, last operated by Pennzoil Company.

The RRC has issued 3 drilling permits between 1983 and 1990, permitted to 6,300 ft.

It was permitted by Pennzoil Exploration & Prod. CO. and has since transferred to Pennzoil Company on the wellbore schedule.

Completion filings report 4 formation tops, including Catahoula, 5500 Sand, 5600 Sand, 6100 Stray.

Operator of record

Pennzoil Company

Permitted by Pennzoil Exploration & Prod. Co.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jun 6, 1997 · 90 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePennzoil Company
Production reportsnone
Latest permitPennzoil Exploration & Prod. Co.Apr 20, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,300
total depth, ft
3
permits on file
Apr 20, 1990
last permit issued
Feb 2, 1984
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 1998

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 2, 1984
Shut in
—
Plugged
Jan 14, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Urban, Armour et AL G-2-136044Gaffney, S.E. (5500)Dabney Well Service, Inc.100Jan 1993 – Jan 1998
— O-2-7308——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
372311-99RecompletionPennzoil Exploration & Prod. Co.Apr 18, 1990Apr 20, 1990—5,950
281227-99RecompletionPennzoil Producing Co.Jul 26, 1985Jul 29, 1985—5,950
222316-99DrillCockrell Oil CorporationDec 1, 1983Dec 1, 1983Dec 11, 19836,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-136044————
—— O-2-7308————

Formation tops

As filed on W-2/G-1. Subsea from 83 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula3,500-3,417
5500 Sand5,502-5,419
5600 Sand5,604-5,521
6100 Stray5,914-5,831

Perforations

Perforated and open-hole intervals.

FromToType
3,2053,210Perforated
3,5903,600Perforated
4,2584,268Perforated
4,3454,355Perforated
5,5025,508Perforated
5,6045,607Perforated
5,9145,920Perforated
5,9245,938Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,65812.25975 S
9.6251,65813.75975 S
9.6251,68812.25975 S
5.55,5908.75800 S
5.55,9508.75800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 31, 1997May 14, 1997—
00Sep 30, 1992Jul 22, 1992—
00Feb 22, 1991Aug 9, 1990Yes
00Nov 27, 1990——
00Dec 10, 1987Oct 21, 1987Yes
00Oct 30, 1987——
00Apr 30, 1984Mar 12, 1984—
00Apr 7, 1984Mar 12, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

17.4K
bbl, last 12 reported months
156K
bbl, all reported
Nov 1997
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000077231W-14 DisposalPlugged Mar 4, 19981,2001,0002,900–4,450

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 17,404 · prior 12 36,600(-52%)

02K4K19961997

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46932144, documented in the API reference.