WELL · 42-469-32241 · DISTRICT 2
Traylor #6
Victoria County · Vertical
Traylor #6 (API 42-469-32241) is a permitted well in Victoria County filed by Magnum Producing & Operating CO.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1984 and 2003, permitted to 8,300 ft.
Completion filings report 3 formation tops, including Catahoula, Greta, Sinton.
Its 2 leases have reported 2.58K barrels of oil and 14 mcf of gas since January 1993, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.
Operator of record
Magnum Producing & Operating Co.
Corpus Chrsti, TX · P-5 Y, filed Dec 5, 2003 · 173 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Magnum Producing, LPthrough Mar 2004 |
| Latest permit | Magnum Producing & Operating Co.Apr 21, 2003 |
- 8,300
- total depth, ft
- 3
- permits on file
- Apr 21, 2003
- last permit issued
- —
- completed
- 2.58K
- cumulative oil, bbl
- 14
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Traylor O-2-6747 | Heyser (6400) | Magnum Producing, LP | 3 | 0 | 0 | Jan 1993 – Jul 2026 |
| Traylor O-2-6870 | Heyser (6450) | Magnum Producing, LP | 2 | 2.58K | 14 | Jan 1993 – Aug 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Magnum Producing & Operating Co.Jan 1993 → Jan 2004
- 2Magnum Producing, LPFeb 2004 → Mar 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 530972-99 | Recompletion | Magnum Producing & Operating Co. | Apr 21, 2003 | Apr 21, 2003 | — | 7,748 |
| 403951-99 | Recompletion | Magnum Producing & Operating Co. | Sep 28, 1992 | Oct 5, 1992 | Jul 30, 1992 | 7,748 |
| 239644-99 | Drill | BHP Petroleum (USA) Inc. | May 21, 1984 | May 22, 1984 | Jun 13, 1984 | 8,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-6747 | — | — | — | — |
| — | — O-2-6870 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 56 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,391 | 6,394 | Perforated |
| 6,420 | 6,424 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,850 | 13.5 | 840 sx |
| 5.5 | 6,863 | 8.75 | 540 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 1, 1992 | Sep 23, 1992 | Yes |
| 00 | Oct 14, 1992 | Aug 6, 1984 | — |
| 00 | Sep 25, 1984 | Aug 6, 1984 | — |
| 00 | Aug 29, 1984 | Aug 6, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-32241 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-32241 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46932241, documented in the API reference.