WELL · 42-469-32319 · DISTRICT 2
Scherer #1D
Victoria County · Vertical
Scherer #1D (API 42-469-32319) is a plugged well in Victoria County, plugged January 17, 1985, last operated by Allegro Investments, Inc..
The RRC has issued 2 drilling permits between 1984 and 1994, permitted to 11,000 ft.
Operator of record
Victoria, TX · P-5 Y, filed Oct 2, 2020 · 298 permits on file · (361) 573-5619
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Allegro Investments, Inc.Mar 3, 1994 |
- 11,000
- total depth, ft
- 2
- permits on file
- Mar 3, 1994
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 1995 THROUGH Nov 2005
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jan 17, 1985
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Scherer G-2-155806 | Telferner, North (2600) | Fredco | 1 | 0 | 0 | Jul 1995 – Nov 2005 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 421696-99 | Reenter | Allegro Investments, Inc. | Mar 3, 1994 | Mar 3, 1994 | Jun 20, 1995 | 2,800 |
| 256688-99 | Drill | West, Thomas S., Jr. | Oct 24, 1984 | Nov 6, 1984 | — | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-155806 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,700 | 2,710 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7.625 | 2,660 | 13.375 | 400 S |
| 13.375 | 2,875 | 17.25 | 1,990 S |
| 9.625 | 4,846 | 12.25 | 700 S |
| 7.625 | 7,374 | 8.5 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 4, 1996 | Aug 3, 1995 | Yes |
| 00 | Nov 6, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-32319 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-32319 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 569K
- bbl, all reported
- Nov 2005
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000082655 | H-1 Injection | Plugged Dec 29, 2005 | 6,500 | 1,350 | 2,700–2,730 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46932319, documented in the API reference.