WELL · 42-469-32465 · DISTRICT 2

Friar #2

Plugged

Victoria County · Helen Gohlke (Yegua 5640) field  · Vertical

Friar #2 (API 42-469-32465) is a plugged well in Victoria County, plugged May 12, 1989, last operated by Mccord Exploration CO..

The RRC has issued 2 drilling permits between 1986 and 1996, permitted to 6,000 ft.

It was permitted by HR Petroleum and has since transferred to Mccord Exploration CO. on the wellbore schedule.

Completion filings report one formation top, including Yegua.

Its 3 leases have reported 2.25K barrels of oil and 56.5K mcf of gas since February 1996, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

McCord Exploration Co.

Permitted by HR Petroleum; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed May 15, 1991 · 76 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcCord Exploration Co.
Production reportsCamoil, Inc.through Jan 2016
Latest permitHR PetroleumJan 8, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,000
total depth, ft
2
permits on file
Jan 8, 1996
last permit issued
Mar 22, 1986
completed
2.25K
cumulative oil, bbl
56.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 22, 1986
Shut in
—
Plugged
May 12, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Friar, Thomas G-2-172084Helen Gohlke ( Yegua K)Field Petroleum Corp.1026.8KNov 1998 – Jul 2026
Friar, Thomas O-2-8261Helen Gohlke ( Yegua K)PH Exploration, Inc.12.25K12.8KJun 1997 – Sep 2000
Friar, Thomas G-2-157805Helen Gohlke ( Yegua K)HR Petroleum1016.9KFeb 1996 – Sep 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1HR PetroleumFeb 1996 → Apr 1998
  2. 2PH Exploration, Inc.May 1998 → Apr 1999
  3. 3TBC PetroleumDec 2005 → Aug 2006
  4. 4Quality Extraction Serv & OP LLCJun 2011 → Jun 2011
  5. 5Camoil, Inc.Oct 2015 → Jan 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
443036-99ReenterHR PetroleumDec 20, 1995Jan 8, 1996Feb 1, 19965,855
298223-99DrillMcCord Exploration Co.Mar 11, 1986Feb 21, 1986Feb 24, 19866,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-157805————
—— G-2-172084————
—— O-2-8261————

Formation tops

As filed on W-2/G-1. Subsea from 171 ft elevation.Download CSV →

FormationMD ftSubsea
YeguaYEGUA K5,345-5,174
YeguaYEGUA K5,382-5,211
YeguaLOWER YEGUA5,640-5,469

Perforations

Perforated and open-hole intervals.

FromToType
5,3495,356Perforated
5,6445,650Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62584512.25388 S
4.55,8057.875715 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 11, 1999——
00Jul 28, 1997Jun 25, 1997—
00Jul 24, 1997——
00Jul 1, 1996Mar 6, 1996Yes
00May 10, 1996——
00Jun 12, 1986May 9, 1986Yes
00Jun 5, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46932465, documented in the API reference.