WELL · 42-469-32556 · DISTRICT 2
Gaugler August #6
Victoria County · Coletto Creek East (2900) field · Vertical
Gaugler August #6 (API 42-469-32556) is a plugged well in Victoria County, plugged October 21, 2011, last operated by Mandarin Oil & Gas Company.
The RRC has issued one drilling permit, issued August 24, 1987, permitted to 3,300 ft.
Completion filings report one formation top, including Catahoula.
Its lease has reported 69.3K barrels of oil and 20 mcf of gas since January 1993, last reporting in August 2012. The lease carries 8 wells, so these are lease totals, not this well alone.
Operator of record
Austin, TX · P-5 Y, filed Mar 4, 2026 · 68 permits on file · (361) 645-4520
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mandarin Oil & Gas Company |
| Production reports | Mandarin Oil & Gas Companythrough Aug 2009 |
| Latest permit | Mandarin Oil & Gas CompanyAug 24, 1987 |
- 3,300
- total depth, ft
- 1
- permits on file
- Aug 24, 1987
- last permit issued
- Nov 5, 1987
- completed
- 69.3K
- cumulative oil, bbl
- 20
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 5, 1987
- Shut in
- —
- Plugged
- Oct 21, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gaugler,august O-2-6002 | Coletto Creek, East (2900) | Mandarin Oil & Gas Company | 8 | 69.3K | 20 | Jan 1993 – Aug 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mandarin Oil & Gas CompanyJan 1993 → Aug 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 334810-99 | Drill | Mandarin Oil & Gas Company | Aug 20, 1987 | Aug 24, 1987 | — | 3,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-6002 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 95 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CatahoulaCATAHOULA MASSIVE | 2,960 | -2,865 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,823 | 2,831 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 340 | 12.25 | 150 S |
| 5.5 | 3,152 | 7.875 | 425 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 19, 1988 | Mar 17, 1988 | Yes |
| 00 | Apr 29, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-32556 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-32556 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 5.29M
- bbl, all reported
- Jul 2012
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000065164 | W-14 Disposal | Plugged Nov 21, 2011 | 3,500 | 600 | 3,142–3,168 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46932556, documented in the API reference.