WELL · 42-469-32771 · DISTRICT 2

McCan C.K. #3

Plugged

Victoria County · Sawgrass (Cordele Sd.) field  · Vertical

Mccan C.K. #3 (API 42-469-32771) is a plugged well in Victoria County, plugged December 19, 2002, last operated by Allegro Investments Inc..

The RRC has issued 3 drilling permits (amended once) between 1990 and 1993, permitted to 2,700 ft.

Its 2 leases have reported 207K barrels of oil and 5.83K mcf of gas since January 1993, last reporting in February 2003. The leases carry 9 wells, so these are lease totals, not this well alone.

Operator of record

Allegro Investments Inc.

Victoria, TX · P-5 Y, filed Oct 2, 2020 · 298 permits on file · (361) 573-5619

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAllegro Investments Inc.
Production reportsAllegro Investments, Inc.through May 2002
Latest permitAllegro Investments, Inc.Jun 22, 1993
2,700
total depth, ft
4
permits on file
Jun 22, 1993
last permit issued
Feb 16, 1994
completed
207K
cumulative oil, bbl
5.83K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 16, 1994
Shut in
—
Plugged
Dec 19, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McCan, C.K. O-2-7561Sawgrass (Cordele Sd.)Allegro Investments, Inc.8207K1.33KJan 1993 – Feb 2003
McCan, C. K. G-2-142498Gravel (Miocene 2200)Allegro Investments, Inc.104.5KJan 1993 – Jun 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Miller, W. C. Operating CompanyJan 1993 → Feb 1993
  2. 2Allegro Investments, Inc.Mar 1993 → May 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
413076-99RecompletionAllegro Investments, Inc.Jun 22, 1993Jun 22, 1993May 24, 19932,700
400834-98RecompletionMiller, W. C. Operating CompanyAug 6, 1992Jul 9, 1992Jul 13, 19922,509
400834-99RecompletionMiller, W. C. Operating CompanyJul 2, 1992Jul 9, 1992—2,509
376089-99DrillMiller, W. C. Operating CompanyJul 30, 1990Jul 31, 1990Aug 17, 19902,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-142498————
—— O-2-7561————

Perforations

Perforated and open-hole intervals.

FromToType
2,0622,064Perforated
2,0632,068Perforated
2,1002,114Perforated
2,1552,160Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62536812.25175 S
4.52,5097.875366 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 28, 1994Mar 23, 1994—
00Oct 14, 1993Jun 16, 1993Yes
00Dec 18, 1992Aug 7, 1992—
00Oct 13, 1992—Yes
00Dec 20, 1990Dec 5, 1990Yes
00Dec 7, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

105K
bbl, last 12 reported months
3.1M
bbl, all reported
Jul 2002
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000080113H-1 InjectionPlugged Jan 30, 20036,0001,0002,050–2,115

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 105,135 · prior 12 353,239(-70%)

020K40K20012002

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46932771, documented in the API reference.