WELL · 42-469-32804 · DISTRICT 2
McCan C. K. Jr. et AL #C 8
Victoria County · Salem (1440) field · Vertical
Mccan C. K. JR. ET AL #C 8 (API 42-469-32804) is a plugged well in Victoria County, plugged January 20, 2012, last operated by B.P. Productions Inc..
The RRC has issued one drilling permit (amended once), issued November 16, 1990, permitted to 1,500 ft.
It was permitted by Enercorp Resources, Inc. and has since transferred to B.P. Productions Inc. on the wellbore schedule.
Completion filings report one formation top, including Miocene (undifferentiated).
Operator of record
Permitted by Enercorp Resources, Inc.; the EWA schedule now lists a different operator.
Victoria, TX · P-5 Active, filed May 22, 2026 · 42 permits on file · (361) 550-3685
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | B.P. Productions Inc. |
| Production reports | Enercorp Resources, Inc.through Oct 1993 |
| Latest permit | Enercorp Resources, Inc.Nov 16, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,500
- total depth, ft
- 2
- permits on file
- Nov 16, 1990
- last permit issued
- Jan 15, 1991
- completed
- 0
- cumulative oil, bbl
- 19.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 15, 1991
- Shut in
- —
- Plugged
- Jan 20, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McCan, C. K. Jr., et AL G-2-138594 | Salem (1440) | B.P. Productions Inc. | 1 | 0 | 19.7K | Jan 1993 – Jan 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Enercorp Resources, Inc.Jan 1993 → Oct 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 380994-98 | Drill | Enercorp Resources, Inc. | May 28, 1991 | Nov 16, 1990 | — | 1,500 |
| 380994-99 | Drill | Enercorp Resources, Inc. | Nov 13, 1990 | Nov 16, 1990 | Jan 15, 1991 | 1,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-138594 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 121 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE SANDS | 1 | 120 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,473 | 1,477 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 438 | 12.25 | 165 S |
| 4.5 | 1,520 | 7.875 | 242 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 30, 1991 | May 13, 1991 | Yes |
| 00 | Jul 10, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-32804 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-32804 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46932804, documented in the API reference.