WELL · 42-469-32853 · DISTRICT 2

Traylor T.P. B #70

Y

Victoria County · Heyser (5400 #2) field · Shut IN  · Vertical

Traylor T.P. B #70 (API 42-469-32853) is a well in Victoria County operated by Mcgowan Working Partners Inc., completed September 13, 1991 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued May 15, 1991, permitted to 5,600 ft.

It was permitted by Mcgowan Working Partners and has since transferred to Mcgowan Working Partners Inc. on the wellbore schedule.

Its lease has reported 1.03M barrels of oil and 509K mcf of gas since January 1993, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

McGowan Working Partners Inc.

Permitted by McGowan Working Partners; the EWA schedule now lists a different operator.

Jackson, MS · P-5 Y, filed Aug 4, 2025 · 60 permits on file · (800) 224-4572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcGowan Working Partners Inc.
Production reportsMcGowan Working Partners, Inc.through Apr 2026
Latest permitMcGowan Working PartnersMay 15, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,600
total depth, ft
1
permits on file
May 15, 1991
last permit issued
Sep 13, 1991
completed
1.03M
cumulative oil, bbl
509K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 13, 1991
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Traylor, T.P. "B" O-2-7684Heyser (5400 #2)McGowan Working Partners, Inc.81.03M509KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 4,827 · prior 12 4,867(-1%)

05001K202420252026

Gas, mcf lease total

Last 12 months 2,336 · prior 12 2,166(+8%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1McGowan Working PartnersJan 1993 → Apr 2000
  2. 2McGowan Working Partners, Inc.May 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
387906-99DrillMcGowan Working PartnersMay 14, 1991May 15, 1991May 16, 19915,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-7684————

Perforations

Perforated and open-hole intervals.

FromToType
5,4705,490Perforated
5,4985,510Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7559313.75300 S
7.6255,5359.875920 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 20, 1991Oct 16, 1991Yes
00Nov 7, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
20.8M
bbl, all reported
Aug 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000075625H-1 InjectionActive7,5001505,450–5,525

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46932853, documented in the API reference.