WELL · 42-469-32882 · DISTRICT 2
Haynes G.U. #1
Victoria County · Nursery S. (3625) field · Vertical
Haynes G.U. #1 (API 42-469-32882) is a plugged well in Victoria County, plugged November 26, 2024, last operated by Soundlogic Prod. & Explor. LLC.
The RRC has issued one drilling permit, issued November 6, 1991, permitted to 4,000 ft.
It was permitted by Moose Oil & Gas CO. and has since transferred to Soundlogic Prod. & Explor. LLC on the wellbore schedule.
Completion filings report one formation top, including Frio.
Operator of record
Soundlogic Prod. & Explor. LLC
Permitted by Moose Oil & Gas Co.; the EWA schedule now lists a different operator.
Edna, TX · P-5 Y, filed Feb 4, 2026 · 8 permits on file · (361) 935-0807
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Soundlogic Prod. & Explor. LLC |
| Production reports | Hunter Petroleum Inc.through Jul 1999 |
| Latest permit | Moose Oil & Gas Co.Nov 6, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 1
- permits on file
- Nov 6, 1991
- last permit issued
- Dec 11, 1991
- completed
- 0
- cumulative oil, bbl
- 271K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 11, 1991
- Shut in
- —
- Plugged
- Nov 26, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Haynes G.U. G-2-140762 | Nursery, S. (3625) | Soundlogic Prod. & Explor., LLC | 1 | 0 | 271K | Jan 1993 – Nov 2024 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Westhall Associates, Inc.Jan 1993 → Jun 1993
- 2Moose Oil & Gas Co.Jul 1993 → Apr 1994
- 3Hunter Petroleum Inc.May 1994 → Jul 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 393528-99 | Drill | Moose Oil & Gas Co. | Nov 1, 1991 | Nov 6, 1991 | Nov 8, 1991 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-140762 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 134 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Frio | 2,800 | -2,666 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,599 | 3,601 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 434 | 12.25 | 228 S |
| 2.875 | 3,796 | 7.875 | 1,074 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 14, 1992 | Mar 2, 1992 | — |
| 00 | Mar 10, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-32882 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-32882 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46932882, documented in the API reference.