WELL · 42-469-33130 · DISTRICT 2
Welder Heirs #D 1
Victoria County · Nursery (3100) field · Vertical
Welder Heirs #D 1 (API 42-469-33130) is a plugged well in Victoria County, plugged April 19, 1999, last operated by Talon Development CO. Inc..
The RRC has issued 2 drilling permits (amended once) between 1996 and 1997, permitted to 3,800 ft.
Completion filings report one formation top, including Frio.
Operator of record
Boerne, TX · P-5 Y, filed May 11, 2001 · 150 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Talon Development Co. Inc. |
| Production reports | Petropro Energy Partners, L.P.through Oct 1998 |
| Latest permit | Talon Development Co., Inc.Jun 5, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,800
- total depth, ft
- 3
- permits on file
- Jun 5, 1997
- last permit issued
- Mar 22, 1996
- completed
- 0
- cumulative oil, bbl
- 602K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1996 THROUGH Apr 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 22, 1996
- Shut in
- —
- Plugged
- Apr 19, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Welder Heirs G-2-163916 | Nursery (2800) | Petropro Energy Partners, L.P. | 1 | 0 | 170K | May 1997 – Apr 1999 |
| Welder Heirs G-2-157885 | Nursery (3100) | Talon Development Co., Inc. | 1 | 0 | 432K | Mar 1996 – May 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Talon Development Co., Inc.Mar 1996 → Jan 1998
- 2Petropro Energy Partners, L.P.Feb 1998 → Oct 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 463105-99 | Recompletion | Talon Development Co., Inc. | May 30, 1997 | Jun 5, 1997 | May 16, 1997 | 3,800 |
| 445412-98 | Drill | Talon Development Co., Inc. | Mar 13, 1996 | Mar 1, 1996 | — | 3,800 |
| 445412-99 | Drill | Talon Development Co., Inc. | Mar 1, 1996 | Mar 1, 1996 | Mar 13, 1996 | 3,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-157885 | — | — | — | — |
| — | — G-2-163916 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 159 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Frio | 2,462 | -2,303 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,840 | 2,850 | Perforated |
| 3,030 | 3,042 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 415 | 12.25 | 250 S |
| 5.5 | 3,783 | 7.875 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 30, 1997 | Jul 7, 1997 | Yes |
| 00 | Aug 14, 1997 | — | — |
| 00 | Jun 28, 1996 | Apr 8, 1996 | Yes |
| 00 | May 15, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33130 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33130 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.