WELL · 42-469-33178 · DISTRICT 2
Keeran Ranch #4
Victoria County · Keeran (6300) field · Vertical
Keeran Ranch #4 (API 42-469-33178) is a plugged well in Victoria County, plugged November 21, 2013, last operated by Hart Petroleum Services Inc.
The RRC has issued 4 drilling permits (amended once) between 1996 and 2007, permitted to 7,100 ft.
It was permitted by Southern Bay Operating, L.L.C. and has since transferred to Hart Petroleum Services Inc on the wellbore schedule.
Completion filings report 3 formation tops, including Catahoula, Greta, Sinton.
Its 4 leases have reported 35.8K barrels of oil and 709K mcf of gas since September 1996, last reporting in July 2014. The leases carry 5 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Southern Bay Operating, L.L.C.; the EWA schedule now lists a different operator.
Corpus Christ, TX · P-5 Y, filed Nov 4, 2025 · 146 permits on file · (361) 215-9023
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hart Petroleum Services Inc |
| Production reports | Southern Bay Operating, L.L.C.through Jan 2010 |
| Latest permit | Southern Bay Operating, L.L.C.Jan 5, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,100
- total depth, ft
- 5
- permits on file
- Jan 5, 2007
- last permit issued
- Apr 1, 1998
- completed
- 35.8K
- cumulative oil, bbl
- 709K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1996 THROUGH Jul 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 1, 1998
- Shut in
- —
- Plugged
- Nov 21, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Keeran Ranch "A" O-2-9307 | Keeran (5500) | Remora Management, LLC | 2 | 2.27K | 58.9K | Sep 2006 – Jul 2014 |
| Keeran Ranch G-2-202837 | Keeran (6200) | Remora Management, LLC | 1 | 0 | 262K | Jul 2000 – Nov 2013 |
| Keeran Ranch O-2-8380 | Keeran (6300) | Hart Petroleum Services, Inc | 1 | 33.5K | 92.3K | Apr 1998 – Aug 2004 |
| Keeran Ranch "A" G-2-161545 | Keeran (6040) | Hart Petroleum Services, Inc | 1 | 0 | 296K | Sep 1996 – Mar 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hart Petroleum Services, IncSep 1996 → Aug 2002
- 2Brown, C. Douglas, LLCJan 2003 → Oct 2005
- 3Southern Bay Operating, L.L.C.Nov 2005 → Jan 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 628334-99 | Recompletion | Southern Bay Operating, L.L.C. | Oct 31, 2006 | Jan 5, 2007 | Sep 14, 2006 | 5,800 |
| 518361-99 | Recompletion | Hart Petroleum Services, Inc | Mar 18, 2002 | Apr 3, 2002 | Jun 21, 2000 | 7,100 |
| 475831-99 | Recompletion | Hart Petroleum Services, Inc | Apr 30, 1998 | May 4, 1998 | Mar 26, 1998 | 7,100 |
| 451460-98 | Drill | Hart Petroleum Services, Inc | Jan 6, 1997 | Aug 13, 1996 | — | 7,100 |
| 451460-99 | Drill | Anaqua Oil & Gas, Inc. | Aug 13, 1996 | Aug 13, 1996 | Aug 16, 1996 | 7,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-161545 | — | — | — | — |
| — | — G-2-202837 | — | — | — | — |
| — | — O-2-8380 | — | — | — | — |
| — | — O-2-9307 | — | — | — | — |
| — | — O-2-9307 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 49 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,486 | 5,489 | Perforated |
| 6,066 | 6,071 | Perforated |
| 6,138 | 6,141 | Perforated |
| 6,274 | 6,276 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 732 | 12.5 | 250 S |
| 8.625 | 732 | 12.25 | 350 S |
| 4.5 | 7,110 | 7.875 | 960 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 5, 2009 | Nov 12, 2008 | Yes |
| 00 | Jul 6, 2009 | — | — |
| 00 | Oct 20, 2004 | Nov 30, 2000 | Yes |
| 00 | Aug 19, 2004 | — | — |
| 00 | Sep 24, 1998 | Apr 28, 1998 | Yes |
| 00 | Jul 27, 1998 | — | — |
| 00 | Jun 2, 1997 | Oct 16, 1996 | Yes |
| 00 | Feb 25, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33178 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33178 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46933178, documented in the API reference.