WELL · 42-469-33299 · DISTRICT 2
Dietzel Ed C. #13
Victoria County · Pridham Lake West (2467) field · Vertical
Dietzel ED C. #13 (API 42-469-33299) is a plugged well in Victoria County, plugged June 26, 2002, last operated by Averill W. M. Inc..
The RRC has issued 2 drilling permits between 1997 and 1998, permitted to 3,100 ft.
Completion filings report one formation top, including Catahoula.
Its 2 leases have reported 316K barrels of oil and 32.5K mcf of gas since January 1993, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.
Operator of record
Victoria, TX · P-5 Y, filed May 2, 2003 · 24 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Averill W. M. Inc. |
| Production reports | Petexthrough Apr 2026 |
| Latest permit | Averill, W. M. Inc.Aug 18, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,100
- total depth, ft
- 2
- permits on file
- Aug 18, 1998
- last permit issued
- Dec 15, 1998
- completed
- 316K
- cumulative oil, bbl
- 32.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 15, 1998
- Shut in
- —
- Plugged
- Jun 26, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dietzel, Ed. O-2-4351 | Pridham Lake, West (Catahoula) | Petex | 6 | 316K | 3.76K | Jan 1993 – Jul 2026 |
| Dietzel, Ed C. G-2-172121 | Pridham Lake, West (2467) | Averill, W. M. Inc. | 1 | 0 | 28.7K | Dec 1998 – Jun 2002 |
Oil, barrels lease total
Last 12 months 331 · prior 12 254(+30%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Averill, W. M. Inc.Jan 1993 → Jun 2003
- 2Kamel Oil, L.L.C.Jul 2003 → Jul 2012
- 3Aries Operating, LPAug 2012 → Dec 2017
- 4PetexFeb 2018 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 478779-99 | Recompletion | Averill, W. M. Inc. | Aug 17, 1998 | Aug 18, 1998 | Dec 13, 1998 | 3,048 |
| 470154-99 | Drill | Averill, W. M. Inc. | Nov 17, 1997 | Nov 17, 1997 | Nov 25, 1997 | 3,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-172121 | — | — | — | — |
| — | — O-2-4351 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 76 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,478 | 2,481 | Perforated |
| 2,926 | 2,934 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 320 | 12.25 | 155 S |
| 5.5 | 3,030 | 7.875 | 585 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 30, 2001 | Aug 25, 2000 | — |
| 00 | Jul 23, 1999 | Jan 8, 1999 | Yes |
| 00 | Mar 12, 1999 | — | — |
| 00 | Apr 28, 1998 | Feb 12, 1998 | Yes |
| 00 | Mar 6, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33299 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33299 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46933299, documented in the API reference.