WELL · 42-469-33392 · DISTRICT 2

Pintail Gas Unit #1

Plugged

Victoria County · Bullock S Church S. (10500) field  · Vertical

Pintail Gas Unit #1 (API 42-469-33392) is a plugged well in Victoria County, plugged December 3, 2011, last operated by Tepee Petroleum CO. Inc..

The RRC has issued 2 drilling permits between 1999 and 2002, permitted to 14,000 ft.

It was permitted by Dominion Expl. & Prod., Inc. and has since transferred to Tepee Petroleum CO. Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including Yegua, Sparta, Queen City, Reklaw.

Operator of record

Tepee Petroleum Co. Inc.

Permitted by Dominion Expl. & Prod., Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Oct 8, 2021 · 43 permits on file · (361) 550-3892

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTepee Petroleum Co. Inc.
Production reportsTepee Petroleum Co., Inc.through Dec 2010
Latest permitDominion Expl. & Prod., Inc.Aug 19, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
2
permits on file
Aug 19, 2002
last permit issued
Mar 10, 2000
completed
0
cumulative oil, bbl
446K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2000 THROUGH Dec 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 10, 2000
Shut in
—
Plugged
Dec 3, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pintail Gas Unit G-2-180253Bullock's Church, S. (10500)Tepee Petroleum Co., Inc.10170KMar 2000 – Dec 2011
Pintail Gas Unit G-2-192450Bullock's Church, S. (10,000)Tepee Petroleum Co., Inc.10276KAug 2002 – Dec 2011

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Coastal Oil & Gas CorporationMar 2000 → Jun 2001
  2. 2EL Paso Production Oil & Gas Co.Jul 2001 → Mar 2002
  3. 3Tepee Petroleum Co., Inc.Apr 2002 → Dec 2010
  4. 4Dominion Expl. & Prod., Inc.Aug 2002 → Mar 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
522880-99RecompletionDominion Expl. & Prod., Inc.Aug 19, 2002Aug 19, 2002Aug 2, 200210,450
482712-99DrillGreenbrier Oper. Co.Feb 16, 1999Feb 23, 1999Mar 25, 199914,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-180253————
—— G-2-192450————

Formation tops

As filed on W-2/G-1. Subsea from 183 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua5,240-5,057
Sparta7,230-7,047
Queen City7,720-7,537
Reklaw9,330-9,147
Wilcox9,770-9,587
WilcoxWILCOX 1050010,470-10,287

Perforations

Perforated and open-hole intervals.

FromToType
10,09410,100Perforated
10,30210,306Perforated
10,47410,476Perforated
10,47810,480Perforated
10,48310,501Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,94817.52,195 S
9.6256,50012.25775 S
7.62511,1958.5400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 10, 2004Dec 15, 2003—
00Mar 18, 2003Nov 12, 2002Yes
00Jan 30, 2003——
00Apr 26, 2001Apr 11, 2000Yes
00Jan 12, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46933392, documented in the API reference.