WELL · 42-469-33463 · DISTRICT 2
Hewitt #1
Victoria County · Telferner (2200) field · Vertical
Hewitt #1 (API 42-469-33463) is a plugged well in Victoria County, plugged August 5, 2019, last operated by Hollimon Oil Corporation.
The RRC has issued 2 drilling permits between 2000 and 2008, permitted to 3,200 ft.
Completion filings report 3 formation tops, including Miocene (undifferentiated), Catahoula, Frio.
Operator of record
Castroville, TX · P-5 Y, filed Feb 5, 2016 · 262 permits on file · (210) 842-2262
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hollimon Oil Corporation |
| Production reports | Hollimon Oil Corporationthrough May 2009 |
| Latest permit | Hollimon Oil CorporationOct 27, 2008 |
- 3,200
- total depth, ft
- 2
- permits on file
- Oct 27, 2008
- last permit issued
- Mar 3, 2000
- completed
- 0
- cumulative oil, bbl
- 928K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2000 THROUGH Aug 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 3, 2000
- Shut in
- —
- Plugged
- Aug 5, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hewitt G-2-250555 | Telferner (2000) | Field Petroleum Corp. | 1 | 0 | 6.33K | Oct 2008 – Aug 2019 |
| Hewitt G-2-177236 | Telferner (2200) | Hollimon Oil Corporation | 1 | 0 | 922K | Mar 2000 – Oct 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hollimon Oil CorporationMay 2000 → May 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 673497-99 | Recompletion | Hollimon Oil Corporation | Oct 20, 2008 | Oct 27, 2008 | Oct 27, 2008 | 1,900 |
| 491954-99 | Drill | Hollimon Oil Corporation | Feb 10, 2000 | Feb 10, 2000 | Feb 11, 2000 | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-177236 | — | — | — | — |
| — | — G-2-250555 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 97 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 2,000 | -1,903 |
| Catahoula | 2,900 | -2,803 |
| Frio | 3,400 | -3,303 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,743 | 1,744 | Perforated |
| 2,228 | 2,238 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 525 | 12.25 | 320 S |
| 4.5 | 3,107 | 7.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 2, 2010 | Oct 31, 2008 | Yes |
| 00 | Aug 31, 2009 | — | — |
| 00 | Jul 24, 2000 | Apr 17, 2000 | Yes |
| 00 | Jun 15, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33463 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33463 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46933463, documented in the API reference.