WELL · 42-469-33486 · DISTRICT 2
Hewitt #2
Victoria County · Telferner (2750) field · Vertical
Hewitt #2 (API 42-469-33486) is a plugged well in Victoria County, plugged September 17, 2021, last operated by Hollimon Oil Corporation.
The RRC has issued 3 drilling permits (amended 3 times) between 2000 and 2003, permitted to 5,050 ft.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.
Operator of record
Castroville, TX · P-5 Y, filed Feb 5, 2016 · 262 permits on file · (210) 842-2262
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hollimon Oil Corporation |
| Production reports | Hollimon Oil Corporationthrough Feb 2007 |
| Latest permit | Hollimon Oil CorporationJan 24, 2003 |
- 5,050
- total depth, ft
- 6
- permits on file
- Jan 24, 2003
- last permit issued
- Apr 16, 2002
- completed
- 0
- cumulative oil, bbl
- 210K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2001 THROUGH Sep 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 16, 2002
- Shut in
- —
- Plugged
- Sep 17, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hewitt G-2-194689 | Telferner (2200) | Field Petroleum Corp. | 1 | 0 | 142K | Jan 2003 – Sep 2021 |
| Hewitt G-2-189737 | Telferner (2750) | Hollimon Oil Corporation | 1 | 0 | 13.1K | Apr 2002 – Jan 2003 |
| Hewitt G-2-184437 | Marcado Creek (2000) | Hollimon Oil Corporation | 1 | 0 | 39.7K | Jun 2001 – Apr 2002 |
| Hewitt G-2-184440 | Telferner (2200) | Hollimon Oil Corporation | 1 | 0 | 15.1K | Jun 2001 – Apr 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hollimon Oil CorporationJun 2001 → Feb 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 527405-99 | Recompletion | Hollimon Oil Corporation | Jan 17, 2003 | Jan 24, 2003 | Jan 25, 2003 | 5,050 |
| 518845-98 | Recompletion | Hollimon Oil Corporation | Jan 23, 2003 | Apr 10, 2002 | — | 5,050 |
| 518845-99 | Recompletion | Hollimon Oil Corporation | Apr 5, 2002 | Apr 10, 2002 | Apr 13, 2002 | 5,050 |
| 495943-97 | Drill | Hollimon Oil Corporation | Jun 11, 2001 | Jun 8, 2000 | Apr 21, 2001 | 5,050 |
| 495943-98 | Drill | Hollimon Oil Corporation | Mar 19, 2001 | Jun 8, 2000 | — | 5,050 |
| 495943-99 | Drill | Hollimon Oil Corporation | Jun 8, 2000 | Jun 8, 2000 | — | 5,050 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-184437 | — | — | — | — |
| — | — G-2-184440 | — | — | — | — |
| — | — G-2-189737 | — | — | — | — |
| — | — G-2-194689 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 107 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 1,960 | -1,853 |
| Frio | 3,042 | -2,935 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,964 | 1,974 | Perforated |
| 2,195 | 2,197 | Perforated |
| 2,224 | 2,229 | Perforated |
| 2,683 | 2,685 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 504 | 12.25 | 290 S |
| 8.375 | 504 | — | 290 S |
| 4.5 | 2,899 | 7.875 | 510 S |
| 4.5 | 2,899 | — | 510 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 29, 2004 | Feb 11, 2003 | Yes |
| 00 | Jun 5, 2003 | — | — |
| 00 | Feb 20, 2003 | May 2, 2002 | — |
| 00 | Aug 6, 2002 | — | — |
| 00 | Jan 4, 2002 | Jul 13, 2001 | Yes |
| 00 | Jan 3, 2002 | Jul 13, 2001 | Yes |
| 00 | Sep 25, 2001 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33486 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33486 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46933486, documented in the API reference.