WELL · 42-469-33627 · DISTRICT 2
Welder Unit #15
Victoria County · Marcado Creek E. (4750) field · Vertical
Welder Unit #15 (API 42-469-33627) is a well in Victoria County operated by Cummins & Walker Oil CO. Inc., completed January 17, 2002.
The RRC has issued 2 drilling permits between 2001 and 2006, permitted to 5,450 ft.
Completion filings report 4 formation tops, including Miocrne, Frio, Catahoula, Greta.
No lease production has been reported under this well’s leases.
Operator of record
Austin, TX · P-5 Y, filed Dec 4, 2025 · 365 permits on file · (512) 914-6754
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cummins & Walker Oil Co. Inc. |
| Production reports | Cummins & Walker Oil Co., Inc.through May 2008 |
| Latest permit | Cummins & Walker Oil Co., Inc.Jul 5, 2006 |
- 5,450
- total depth, ft
- 2
- permits on file
- Jul 5, 2006
- last permit issued
- Jan 17, 2002
- completed
- 0
- cumulative oil, bbl
- 509K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 17, 2002
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Welder, Minnie Est G-2-221031 | Marcado Creek (4290 Frio) | Beaver Oil & Gas Operating, LLC | 1 | 0 | 206K | Jun 2006 – Jul 2026 |
| Welder Unit G-2-188167 | Marcado Creek, E. (4750) | Cummins & Walker Oil Co., Inc. | 1 | 0 | 302K | Jan 2002 – Jun 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cummins & Walker Oil Co., Inc.Jan 2002 → May 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 620847-99 | Recompletion | Cummins & Walker Oil Co., Inc. | Jun 12, 2006 | Jul 5, 2006 | — | 4,264 |
| 515804-99 | Drill | Cummins & Walker Oil Co., Inc. | Dec 4, 2001 | Dec 11, 2001 | Jan 3, 2002 | 5,450 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-188167 | — | — | — | — |
| — | — G-2-221031 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 85 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,249 | 4,252 | Perforated |
| 4,259 | 4,264 | Perforated |
| 4,734 | 4,738 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,411 | 12.25 | 421 S |
| 2.875 | 4,900 | 7.875 | 770 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 12, 2007 | Jul 18, 2006 | Yes |
| 00 | Nov 8, 2006 | — | — |
| 00 | Jun 10, 2002 | Jan 23, 2002 | Yes |
| 00 | Apr 25, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33627 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33627 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46933627, documented in the API reference.