WELL · 42-469-33765 · DISTRICT 2
North Shore Musselman B #2
Victoria County · Salem (2500) field · Vertical
North Shore Musselman B #2 (API 42-469-33765) is a plugged well in Victoria County, plugged April 16, 2013, last operated by North Shore Energy L.L.C..
The RRC has issued 5 drilling permits between 2003 and 2012, permitted to 4,544 ft.
It was permitted by Pine Ridge Operating, L.P. and has since transferred to North Shore Energy L.L.C. on the wellbore schedule.
Completion filings report 7 formation tops, including Miocene (undifferentiated), Shale And Sand, Oakville, Shale & Sd..
Operator of record
Permitted by Pine Ridge Operating, L.P.; the EWA schedule now lists a different operator.
Austin, TX · P-5 Y, filed Aug 4, 2025 · 38 permits on file · (512) 797-0153
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | North Shore Energy L.L.C. |
| Production reports | Pine Ridge Operating, L.P.through Aug 2012 |
| Latest permit | Pine Ridge Operating, L.P.Sep 18, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,544
- total depth, ft
- 5
- permits on file
- Sep 18, 2012
- last permit issued
- Jan 5, 2004
- completed
- 0
- cumulative oil, bbl
- 213K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2004 THROUGH Apr 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 5, 2004
- Shut in
- —
- Plugged
- Apr 16, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| North Shore Musselman 'B' G-2-266059 | Salem (1650) | Pine Ridge Operating, L.P. | 1 | 0 | 0 | Dec 2012 – Apr 2013 |
| North Shore Musselman "B" G-2-255444 | Salem (2100) | Pine Ridge Operating, L.P. | 1 | 0 | 69.6K | Mar 2010 – Dec 2012 |
| North Shore Musselman "B" G-2-231378 | Salem (2250) | Pine Ridge Operating, L.P. | 1 | 0 | 94.7K | Oct 2007 – Mar 2010 |
| North Shore Musselman "B" G-2-201719 | Salem (2500) | North Shore Energy, L.L.C. | 1 | 0 | 42.8K | Jan 2004 – Oct 2007 |
| North Shore Musselman "B" G-2-225009 | Salem (2400) | Pine Ridge Operating, L.P. | 1 | 0 | 6.04K | Aug 2006 – Oct 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1North Shore Energy, L.L.C.Jan 2004 → Mar 2007
- 2Pine Ridge Operating, L.P.Apr 2007 → Aug 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 747286-99 | Recompletion | Pine Ridge Operating, L.P. | Aug 28, 2012 | Sep 18, 2012 | Dec 27, 2012 | 2,180 |
| 689083-99 | Recompletion | Pine Ridge Operating, L.P. | Dec 28, 2009 | Jan 25, 2010 | Mar 1, 2010 | 2,180 |
| 643483-99 | Recompletion | Pine Ridge Operating, L.P. | Jul 30, 2007 | Sep 6, 2007 | Oct 18, 2007 | 2,350 |
| 628713-99 | Recompletion | North Shore Energy, L.L.C. | Nov 7, 2006 | Dec 1, 2006 | Aug 10, 2006 | 4,544 |
| 536409-99 | Drill | North Shore Energy, L.L.C. | Sep 12, 2003 | Sep 12, 2003 | Sep 12, 2003 | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-201719 | — | — | — | — |
| — | — G-2-225009 | — | — | — | — |
| — | — G-2-231378 | — | — | — | — |
| — | — G-2-255444 | — | — | — | — |
| — | — G-2-266059 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 119 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 1 | 118 |
| Miocene (undifferentiated)MIOCENE | 1,567 | -1,448 |
| Shale and Sand | 1,567 | -1,448 |
| OakvilleOAKVILLE AND SHALE | 1,950 | -1,831 |
| OakvilleOAKVILLE & SHALE | 1,950 | -1,831 |
| Shale & Sd. | 1,950 | -1,831 |
| Catahoula | 2,665 | -2,546 |
| Oakville | 2,665 | -2,546 |
| Catahoula | 2,950 | -2,831 |
| Cathoula | 2,950 | -2,831 |
| Frio | 2,950 | -2,831 |
| Frio | 4,544 | -4,425 |
| Miocene (undifferentiated)MIOCENE | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,557 | 1,559 | Perforated |
| 1,662 | 1,668 | Perforated |
| 2,016 | 2,020 | Perforated |
| 2,228 | 2,232 | Perforated |
| 2,366 | 2,368 | Perforated |
| 2,582 | 2,584 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 100 | 7.875 | 870 S |
| 8.375 | 558 | 12.25 | 243 S |
| 8.375 | 588 | 12.25 | 130 S |
| 4.5 | 1,000 | 7.875 | 870 S |
| 4.5 | 4,000 | 7.875 | 870 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 7, 2013 | Feb 7, 2013 | — |
| 00 | Jul 8, 2010 | Mar 11, 2010 | Yes |
| 00 | Apr 29, 2010 | — | — |
| 00 | Jan 18, 2008 | Nov 1, 2007 | Yes |
| 00 | Dec 10, 2007 | — | — |
| 00 | May 8, 2007 | Feb 9, 2007 | — |
| 00 | Mar 5, 2007 | — | — |
| 00 | Nov 3, 2004 | Jan 29, 2004 | Yes |
| 00 | Jun 25, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33765 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33765 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46933765, documented in the API reference.