WELL · 42-469-33851 · DISTRICT 2
Scherer-Diebel #1
Victoria County · Telferner North (3600 Frio) field · Vertical
Scherer-Diebel #1 (API 42-469-33851) is a plugged well in Victoria County, plugged March 31, 2011, last operated by Brayton Operating Corp..
The RRC has issued 3 drilling permits between 2004 and 2009, permitted to 4,900 ft.
Completion filings report 4 formation tops, including Catahoula, Cathahoula, 3600 Frio, Frio.
Operator of record
Corpus Chrsti, TX · P-5 Y, filed Dec 4, 2009 · 218 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Brayton Operating Corp. |
| Production reports | Brayton Operating Corp.through Jul 2009 |
| Latest permit | Brayton Operating Corp.Jun 19, 2009 |
- 4,900
- total depth, ft
- 3
- permits on file
- Jun 19, 2009
- last permit issued
- Sep 15, 2004
- completed
- 0
- cumulative oil, bbl
- 227K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2004 THROUGH Jun 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 15, 2004
- Shut in
- —
- Plugged
- Mar 31, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Scherer-Diebel G-2-220884 | Telferner, North (2600) | Alta Mesa Services, LP | 1 | 0 | 32.7K | May 2006 – Jun 2011 |
| Scherer-Diebel G-2-250359 | Telferner, North (2100) | Alta Mesa Services, LP | 1 | 0 | 4.48K | Jun 2009 – Mar 2011 |
| Scherer-Diebel G-2-207662 | Telferner, North (3600 Frio) | Brayton Operating Corp. | 1 | 0 | 190K | Sep 2004 – May 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brayton Operating Corp.Sep 2004 → Jul 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 682099-99 | Recompletion | Brayton Operating Corp. | Jun 12, 2009 | Jun 19, 2009 | Jun 2, 2009 | 4,689 |
| 619928-99 | Recompletion | Brayton Operating Corp. | May 25, 2006 | Jun 1, 2006 | — | 4,900 |
| 547358-99 | Drill | Brayton Operating Corp. | Jun 23, 2004 | Jun 23, 2004 | Sep 2, 2004 | 4,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-207662 | — | — | — | — |
| — | — G-2-220884 | — | — | — | — |
| — | — G-2-250359 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 101 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,087 | 2,090 | Perforated |
| 2,612 | 2,614 | Perforated |
| 3,599 | 3,602 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 550 | 12.25 | 225 S |
| 2.875 | 3,742 | 7.875 | 1,060 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 25, 2009 | Jun 23, 2009 | Yes |
| 00 | Aug 24, 2009 | — | — |
| 00 | Jan 3, 2008 | May 26, 2006 | Yes |
| 00 | Nov 7, 2006 | — | — |
| 00 | Jun 28, 2005 | Oct 29, 2004 | Yes |
| 00 | Apr 19, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33851 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33851 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.