WELL · 42-469-33854 · DISTRICT 2
Miori #1
Victoria County · Marcado Creek E. (2800) field · Vertical
Miori #1 (API 42-469-33854) is a plugged well in Victoria County, plugged October 1, 2008, last operated by Brayton Operating Corp..
The RRC has issued 2 drilling permits between 2004 and 2006, permitted to 3,200 ft.
Completion filings report 4 formation tops, including Miocene (undifferentiated), 2800 Sand, 2800' Sand, Catahoula.
Operator of record
Corpus Chrsti, TX · P-5 Y, filed Dec 4, 2009 · 218 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Brayton Operating Corp. |
| Production reports | Brayton Operating Corp.through Oct 2007 |
| Latest permit | Brayton Operating Corp.Jun 5, 2006 |
- 3,200
- total depth, ft
- 2
- permits on file
- Jun 5, 2006
- last permit issued
- Nov 10, 2004
- completed
- 0
- cumulative oil, bbl
- 139K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2004 THROUGH Sep 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 10, 2004
- Shut in
- —
- Plugged
- Oct 1, 2008
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Miori G-2-220958 | Marcado Creek (2250) | Brayton Operating Corp. | 1 | 0 | 70.5K | May 2006 – Sep 2008 |
| Miori G-2-209819 | Marcado Creek, E. (2800) | Brayton Operating Corp. | 1 | 0 | 68.3K | Nov 2004 – May 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brayton Operating Corp.Mar 2005 → Oct 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 620170-99 | Recompletion | Brayton Operating Corp. | May 31, 2006 | Jun 5, 2006 | — | 3,200 |
| 548143-99 | Drill | Brayton Operating Corp. | Jul 13, 2004 | Jul 14, 2004 | Oct 28, 2004 | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-209819 | — | — | — | — |
| — | — G-2-220958 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 89 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 1,676 | -1,587 |
| 2800 Sand | 2,839 | -2,750 |
| 2800' Sand | 2,839 | -2,750 |
| Catahoula | 2,915 | -2,826 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,278 | 2,282 | Perforated |
| 2,839 | 2,841 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7.625 | 455 | 12.25 | 193 S |
| 2.875 | 3,170 | 7.875 | 924 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 12, 2007 | Jun 6, 2006 | Yes |
| 00 | Nov 8, 2006 | — | — |
| 00 | Oct 24, 2005 | Apr 6, 2005 | Yes |
| 00 | Aug 5, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33854 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33854 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46933854, documented in the API reference.