WELL · 42-469-33956 · DISTRICT 2
O'Connor #1
Victoria County · Vertical
O'Connor #1 (API 42-469-33956) is a permitted well in Victoria County filed by Midway Drilling CO.; no completion report is on file yet.
The RRC has issued 4 drilling permits (amended once) between 2005 and 2015, permitted to 4,000 ft.
Completion filings report 3 formation tops, including 1200', 2640', Catahoula.
Its 3 leases have reported 38.5K barrels of oil and 43.3K mcf of gas since May 2006, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Richmond, TX · P-5 Y, filed Apr 4, 2026 · 10 permits on file · (281) 936-1134
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Midway Drilling Co.through Mar 2016 |
| Latest permit | Midway Drilling Co.Dec 28, 2015 |
- 4,000
- total depth, ft
- 5
- permits on file
- Dec 28, 2015
- last permit issued
- —
- completed
- 38.5K
- cumulative oil, bbl
- 43.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| O'Connor O-2-9053 | Anaqua | Midway Drilling Co. | 2 | 34K | 113 | May 2006 – Jul 2026 |
| O'Connor O-2-9240 | Anaqua (3000) | Midway Drilling Co. | 1 | 4.46K | 27 | Jul 2008 – Jul 2026 |
| O'Connor G-2-227142 | Anaqua (2960) | Midway Drilling Co. | 1 | 0 | 43.2K | Apr 2007 – Jun 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1QNK Energy,inc.May 2006 → Aug 2006
- 2Midway Drilling Co.Sep 2006 → Mar 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 811340-99 | Recompletion | Midway Drilling Co. | Oct 19, 2015 | Dec 28, 2015 | — | 3,210 |
| 660611-99 | Recompletion | Midway Drilling Co. | Apr 28, 2008 | May 29, 2008 | Jun 5, 2008 | 4,000 |
| 634953-99 | Recompletion | Midway Drilling Co. | Mar 9, 2007 | Apr 4, 2007 | — | 4,000 |
| 611577-98 | Drill | QNK Energy,inc. | Sep 21, 2006 | Dec 27, 2005 | Mar 5, 2006 | 4,000 |
| 611577-99 | Drill | QNK Energy,inc. | Dec 27, 2005 | Dec 27, 2005 | Mar 5, 2006 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-227142 | — | — | — | — |
| — | — O-2-9053 | — | — | — | — |
| — | — O-2-9240 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 50 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,951 | 2,956 | Perforated |
| 2,990 | 2,994 | Perforated |
| 3,066 | 3,070 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,266 | 12.25 | 530 S |
| 5.5 | 3,200 | 7.875 | — |
| 5.5 | 3,210 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 26, 2012 | Apr 28, 2011 | — |
| 00 | Oct 3, 2008 | Jul 28, 2008 | Yes |
| 00 | Sep 12, 2008 | — | — |
| 00 | Jun 25, 2007 | May 2, 2007 | Yes |
| 00 | Jun 14, 2007 | — | — |
| 00 | Feb 23, 2007 | May 18, 2006 | Yes |
| 00 | Oct 19, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33956 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33956 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.