WELL · 42-469-34291 · DISTRICT 2

Dean SWD #1

WaterY

Victoria County · Telferner East field · Injection  · Vertical

Dean Swd #1 (API 42-469-34291) is a well in Victoria County operated by Hilcorp Energy Company, completed June 10, 2022 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued January 13, 2014, permitted to 4,961 ft.

It was permitted by Acock/Anaqua Operating CO., LP and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including Catahoula, Frio, Vicksburg, Yegua.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 1.38M barrels injected in the 12 months reported through July 2025.

Operator of record

Hilcorp Energy Company

Permitted by Acock/Anaqua Operating Co., LP; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,453 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsnone
Latest permitAcock/Anaqua Operating Co., LPJan 13, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,961
total depth, ft
2
permits on file
Jan 13, 2014
last permit issued
Jun 10, 2022
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 10, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dean SWD O-2-10981Telferner, EastHilcorp Energy Company100Apr 2014 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
776360-98DrillAcock/Anaqua Operating Co., LPSep 15, 2015Jan 13, 2014Mar 29, 20144,961
776360-99DrillAcock/Anaqua Operating Co., LPDec 30, 2013Jan 13, 2014—4,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-10981————

Formation tops

As filed on W-2/G-1. Subsea from 56 ft elevation.Download CSV →

FormationMD ftSubsea
CatahoulaCATAHOULA - DISPOSAL3,900-3,844
FrioFRIO - DISPOSAL4,450-4,394
VicksburgVICKSBURG - DISPOSAL——
YeguaYEGUA - DISPOSAL——

Perforations

Perforated and open-hole intervals.

FromToType
4,0104,556Perforated
4,5304,556Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,92412.25505 S
74,9388.75495 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 11, 2023Nov 22, 2022—
00Sep 24, 2015Sep 7, 2015—
00Jul 24, 2015Dec 17, 2014—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.38M
bbl, last 12 reported months
23.9M
bbl, all reported
Jul 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000106596H-1 InjectionActive25,0001,9543,908–4,560

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,377,562 · prior 12 968,886(+42%)

0100K200K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46934291, documented in the API reference.