WELL · 42-469-34342 · DISTRICT 2
Agnes West #10
Victoria County · Placedo East (6800) field · NO Production · Vertical
Agnes West #10 (API 42-469-34342) is a well in Victoria County operated by Oro Resources LLC, completed June 15, 2018 and listed as no production on the RRC schedule.
The RRC has issued one drilling permit, issued October 19, 2015, permitted to 7,500 ft.
It was permitted by TT Operating, LLC and has since transferred to Oro Resources LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Catahoula, Frio, Vicksburg, Yegua.
Its lease has reported 15.8K barrels of oil since December 2015, last reporting in July 2026.
Operator of record
Permitted by TT Operating, LLC; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Dec 4, 2025 · (832) 212-3293
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Oro Resources LLC |
| Production reports | Stewardship Resourcesthrough Jun 2022 |
| Latest permit | TT Operating, LLCOct 19, 2015 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,500
- total depth, ft
- 1
- permits on file
- Oct 19, 2015
- last permit issued
- Jun 15, 2018
- completed
- 15.8K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2015 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 15, 2018
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Agnes West O-2-11180 | Placedo, East (6800) | Oro Resources, LLC | 1 | 15.8K | 0 | Dec 2015 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1TT Operating, LLCJan 2018 → May 2018
- 2Stewardship ResourcesJun 2018 → Jun 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 810777-99 | Drill | TT Operating, LLC | Sep 29, 2015 | Oct 19, 2015 | Oct 30, 2015 | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-11180 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 44 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,833 | 6,837 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,478 | 12.25 | 719 S |
| 4.5 | 7,018 | 7.875 | 740 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 9, 2020 | Apr 21, 2020 | Yes |
| 00 | Mar 21, 2017 | Nov 15, 2016 | — |
| 00 | Sep 23, 2016 | Dec 22, 2015 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-34342 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-34342 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46934342, documented in the API reference.