WELL · 42-471-30293 · DISTRICT 3

Tanqueray Unit #1RE

N

Walker County · Crabbs Prairie (James Lime) field  · Horizontal · Sidetrack

Tanqueray Unit #1RE (API 42-471-30293) is a horizontal well in Walker County operated by Anadarko E&P Company LP, completed March 10, 2002.

The RRC has issued 2 drilling permits (amended twice) between 2001 and 2002, permitted to 16,500 ft.

Completion filings report 3 formation tops, including Buda, Glen Rose, James Lime.

No lease production has been reported under this well’s leases.

Operator of record

Anadarko E&P Company LP

Houston, TX · P-5 Y, filed Jul 4, 2025 · 2,635 permits on file · (832) 636-1111

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnadarko E&P Company LP
Production reportsEOG Resources, Inc.through Apr 2026
Latest permitRme Petroleum CompanyAug 30, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

16,500
total depth, ft
4
permits on file
Aug 30, 2002
last permit issued
Mar 10, 2002
completed
0
cumulative oil, bbl
4.27M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 10, 2002
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tanqueray Unit G-3-193240Mossy Grove (Glen Rose)EOG Resources, Inc.103.75MDec 2002 – Jul 2026
Tanqueray Unit G-3-189741Crabbs Prairie (James Lime)Anadarko E&P Company LP10522KMar 2002 – Dec 2002

Gas, mcf lease total

Last 12 months 64,779 · prior 12 103,101(-37%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rme Petroleum CompanyMar 2002 → Sep 2002
  2. 2Anadarko E&P Company LPDec 2002 → Nov 2004
  3. 3Merit Energy CompanyDec 2004 → Jul 2007
  4. 4Bluestone Natural Resources, LLCAug 2007 → Jul 2013
  5. 5EOG Resources, Inc.Aug 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
523264-98Recompletion · sidetrackAnadarko E&P Company LPMar 3, 2003Aug 30, 2002Oct 9, 200214,000
523264-99Recompletion · sidetrackRme Petroleum CompanyAug 30, 2002Aug 30, 2002—14,000
514989-98DrillRme Petroleum CompanyMay 1, 2002Nov 2, 2001—16,500
514989-99DrillRme Petroleum CompanyNov 2, 2001Nov 2, 2001Nov 17, 200116,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-189741————
—— G-3-193240————

Formation tops

As filed on W-2/G-1. Subsea from 325 ft elevation.Download CSV →

FormationMD ftSubsea
Buda12,322-11,997
Glen RoseGLENROSE13,204-12,879
James LimeJAMES15,505-15,180

Perforations

Perforated and open-hole intervals.

FromToType
13,48121,295Perforated
13,58220,324Perforated
15,69420,915Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753,11017.52,290 S
9.62512,63212.251,405 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 14, 2003Jan 29, 2003Yes
00Mar 13, 2003——
00Aug 26, 2002May 23, 2002Yes
00Aug 7, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47130293, documented in the API reference.