WELL · 42-473-30553 · DISTRICT 3

Harlean #1

Plugged

Waller County · Brookshire Salt Dome field  · Vertical

Harlean #1 (API 42-473-30553) is a plugged well in Waller County, plugged May 6, 2000, last operated by R.T.C. Resources Inc..

The RRC has issued one drilling permit, issued April 26, 2000, permitted to 3,200 ft.

It was permitted by Rtc Resources Inc and has since transferred to R.T.C. Resources Inc. on the wellbore schedule.

Operator of record

R.T.C. Resources Inc.

Permitted by RTC Resources Inc; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitRTC Resources IncApr 26, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,200
total depth, ft
1
permits on file
Apr 26, 2000
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 6, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
494463-99DrillRTC Resources IncApr 26, 2000Apr 26, 2000May 1, 20003,200

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000090815H-1 InjectionCanceled Jan 18, 20053,0007002,800–3,400

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47330553, documented in the API reference.