WELL · 42-473-31009 · DISTRICT 3

Kurati #27

Y

Waller County · Brookshire field · Shut IN  · Vertical

Kurati #27 (API 42-473-31009) is a well in Waller County operated by 84 Energy LLC, completed November 27, 2005 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued October 18, 2005, permitted to 5,000 ft.

It was permitted by Gen-Nan Resources & Equip., L.P. and has since transferred to 84 Energy LLC on the wellbore schedule.

Completion filings report one formation top, including Salt Dome.

Its lease has reported 469K barrels of oil and 202K mcf of gas since May 2000, last reporting in July 2026. The lease carries 20 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

84 Energy LLC

Permitted by Gen-Nan Resources & Equip., L.P.; the EWA schedule now lists a different operator.

Sugar Land, TX · P-5 Y, filed Oct 4, 2025 · 1 permits on file · (832) 653-9480

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedule84 Energy LLC
Production reports84 Energy LLCthrough Mar 2025
Latest permitGen-Nan Resources & Equip., L.P.Oct 18, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
1
permits on file
Oct 18, 2005
last permit issued
Nov 27, 2005
completed
469K
cumulative oil, bbl
202K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2000 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 27, 2005
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 20 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kurati O-3-23839Brookshire84 Energy LLC20469K202KMay 2000 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 472(-100%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Gen-Nan Resources & Equip., Inc.May 2000 → Dec 2002
  2. 2Gen-Nan Resources & Equip., L.P.Jan 2003 → Jan 2008
  3. 3Layline Petroleum I, LLCFeb 2008 → May 2013
  4. 4Wapiti Operating, LLCJun 2013 → Mar 2015
  5. 5Clearly Petroleum, LLCApr 2015 → Apr 2020
  6. 6GTG Operating, LLCJun 2020 → Aug 2022
  7. 784 Energy LLCSep 2022 → Mar 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
608065-99DrillGen-Nan Resources & Equip., L.P.Oct 18, 2005Oct 18, 2005Nov 8, 20055,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-23839————

Formation tops

As filed on W-2/G-1. Subsea from 119 ft elevation.Download CSV →

FormationMD ftSubsea
Salt Dome2,980-2,861

Perforations

Perforated and open-hole intervals.

FromToType
2,9803,102Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7566514.75320 S
73,7049.625700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 26, 2007Jan 9, 2007Yes
00Jan 9, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
11.8M
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000096838H-1 InjectionActive4,5001,4902,980–3,600

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 45,296(-100%)

010K20K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.