WELL · 42-473-31236 · DISTRICT 3

Hardy Rufus -B- #36

Y

Waller County · Raccoon Bend (Gutowsky) field · Producing  · Vertical

Hardy Rufus -B- #36 (API 42-473-31236) is a well in Waller County operated by Enhanced Energy Partners Corp, completed April 1, 2016 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued November 13, 2012, permitted to 3,500 ft.

Completion filings report 8 formation tops, including Gutowsky, Gutowksy, Caprock, Catahoula.

Its lease has reported 237K barrels of oil and 45.9K mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Enhanced Energy Partners Corp

Tomball, TX · P-5 Y, filed Oct 4, 2025 · 172 permits on file · (281) 744-3936

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnhanced Energy Partners Corp
Production reportsEnhanced Energy Partners Corpthrough Apr 2026
Latest permitEnhanced Energy Partners CorpNov 13, 2012
3,500
total depth, ft
2
permits on file
Nov 13, 2012
last permit issued
Apr 1, 2016
completed
237K
cumulative oil, bbl
45.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 1, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hardy, Rufus, -B- O-3-8889Raccoon Bend (Gutowsky)Enhanced Energy Partners Corp5237K45.9KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 3,233 · prior 12 2,515(+29%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Apr 1995 → Aug 1995
  2. 2Bargo Energy CompanyMay 2000 → Jul 2000
  3. 3Mission Resources CorporationAug 2001 → Nov 2003
  4. 4T-N-T Engineering, Inc.Dec 2003 → Sep 2007
  5. 5Enhanced Energy Partners CorpOct 2007 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
751307-98DrillEnhanced Energy Partners CorpJan 24, 2013Nov 13, 2012Oct 19, 20143,500
751307-99DrillEnhanced Energy Partners CorpNov 9, 2012Nov 13, 2012Oct 19, 20143,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-8889————

Formation tops

As filed on W-2/G-1. Subsea from 146 ft elevation.Download CSV →

FormationMD ftSubsea
Gutowsky3,270-3,124
Gutowksy3,271-3,125
Gutowsky3,298-3,152
Gutowsky3,352-3,206
CaprockCAPROCK - DISPOSAL——
CatahoulaCATAHOULA SAND - DISPOSAL——
FrioFRIO - DISPOSAL——
Miocene (undifferentiated)MIOCENE - DISPOSAL——
WilcoxWILCOX - DISPOSAL——
YeguaYEGUA - DISPOSAL——

Perforations

Perforated and open-hole intervals.

FromToType
3,2713,273Perforated
3,2983,300Perforated
3,3523,360Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62587412.25385 S
5.53,5017.875382 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 8, 2017Sep 30, 2016—
00Jul 22, 2016Feb 27, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47331236, documented in the API reference.