WELL · 42-475-00936 · DISTRICT 8
Hall #4
Ward County · Rhoda Walker (Canyon 5900) field · Shut IN · Vertical
Hall #4 (API 42-475-00936) is a well in Ward County operated by Nesitor West Texas LLC, completed May 10, 1997 and listed as shut in on the RRC schedule.
The RRC has issued 2 drilling permits (amended once) between 1983 and 1997, permitted to 6,900 ft.
It was permitted by Pittencrieff America, Inc. and has since transferred to Nesitor West Texas LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Bell Canyon, Hall Sand, Thornton A.
Its lease has reported 228K barrels of oil and 958K mcf of gas since January 1993, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Pittencrieff America, Inc.; the EWA schedule now lists a different operator.
Frisco, TX · P-5 Y, filed Nov 4, 2025 · (469) 974-4503
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Nesitor West Texas LLC |
| Production reports | Nesitor West Texas LLCthrough Sep 2019 |
| Latest permit | Pittencrieff America, Inc.Feb 26, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,900
- total depth, ft
- 3
- permits on file
- Feb 26, 1997
- last permit issued
- May 10, 1997
- completed
- 228K
- cumulative oil, bbl
- 958K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 10, 1997
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hall O-10-27514 | Rhoda Walker (Canyon 5900) | Nesitor West Texas LLC | 8 | 228K | 958K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pittencrieff America, Inc.Jan 1993 → Sep 2001
- 2Lario Oil & Gas CompanyOct 2001 → Sep 2016
- 3Crossing Rocks Energy, LLCOct 2016 → Mar 2018
- 4Enwater Operating, LLCApr 2018 → Jan 2019
- 5Waterbridge Texas Operating LLCFeb 2019 → Feb 2019
- 6Nesitor West Texas LLCMar 2019 → Sep 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 459212-98 | Recompletion | Pittencrieff America, Inc. | Jul 24, 1997 | Feb 26, 1997 | Mar 22, 1997 | 6,803 |
| 459212-99 | Recompletion | Pittencrieff America, Inc. | Feb 26, 1997 | Feb 26, 1997 | — | 6,803 |
| 202191-99 | Other | Monsanto Oil Company | Jul 20, 1983 | Jul 20, 1983 | — | 6,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-27514 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,605 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bell Canyon | 4,992 | -2,387 |
| Hall Sand | 6,456 | -3,851 |
| Thornton A | 6,491 | -3,886 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,032 | 5,062 | Perforated |
| 6,128 | 6,212 | Perforated |
| 6,458 | 6,473 | Perforated |
| 6,458 | 6,512 | Perforated |
| 6,494 | 6,512 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,166 | 12.25 | — |
| 2.875 | 6,377 | — | — |
| 5.5 | 6,803 | 7.875 | 1,000 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 18, 1997 | May 19, 1997 | Yes |
| 00 | Jul 29, 1997 | Jun 23, 1997 | — |
| 00 | Mar 7, 1986 | Jan 29, 1986 | — |
| 00 | Jan 12, 1984 | Oct 24, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-00936 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-00936 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47500936, documented in the API reference.