WELL · 42-475-20367 · DISTRICT 8

Eiland T. N. #1

Plugged

Ward County · Lockridge (Wolfcamp 12300) field  · Vertical

Eiland T. N. #1 (API 42-475-20367) is a plugged well in Ward County, plugged July 17, 1973, last operated by El Paso Products CO..

The RRC has issued one drilling permit, issued September 6, 1996, permitted to 9,730 ft.

It was permitted by Devon Energy Corporation(Nevada) and has since transferred to El Paso Products CO. on the wellbore schedule.

Completion filings report 12 formation tops, including Delaware, Cherry Canyon, Bone Sprgs, Bone Spring.

It holds an active disposal or injection permit.

Operator of record

EL Paso Products Co.

Permitted by Devon Energy Corporation(nevada); the EWA schedule now lists a different operator.

Odessa, TX · P-5 Y, filed Feb 15, 1989

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEL Paso Products Co.
Production reportsnone
Latest permitDevon Energy Corporation(nevada)Sep 6, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,730
total depth, ft
1
permits on file
Sep 6, 1996
last permit issued
Sep 30, 1967
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 30, 1967
Shut in
—
Plugged
Jul 17, 1973

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Eiland, T. N. O-10-35567Pyote, South (6450 Sand)Continental Resources, Inc.100Sep 1997 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
451536-99ReenterDevon Energy Corporation(nevada)Aug 15, 1996Sep 6, 1996Feb 26, 19979,730

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-35567————

Formation tops

As filed on W-2/G-1. Subsea from 2,488 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware4,885-2,397
Cherry Canyon5,756-3,268
Bone Sprgs8,147-5,659
Bone SpringBONE SPRINGS8,147-5,659
Wolfcamp10,594-8,106
Mississippian14,640-12,152
Woodford15,900-13,412
Devonian16,225-13,737
Silurian (undifferentiated)SILURIAN16,880-14,392
Fusselman17,130-14,642
Simpson17,762-15,274
Ellenburger19,760-17,272

Perforations

Perforated and open-hole intervals.

FromToType
4,9315,557Perforated
6,0166,554Perforated
12,28012,314Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2058245 Y
13.3752,44417.52,350 S
79,7479.52,195 S
10.7511,20812.253,175 S
7.62515,3949.51,700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 11, 1998Sep 12, 1997Yes
00Jan 6, 1998——
00Jan 12, 1984Oct 10, 1967—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
2.61M
bbl, all reported
Jul 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000085888H-1 InjectionActive6,0002,4004,931–6,554

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47520367, documented in the API reference.