WELL · 42-475-31985 · DISTRICT 8
Pitzer #2
Ward County · Rhoda Walker (Canyon 5900) field · Vertical
Pitzer #2 (API 42-475-31985) is a well in Ward County operated by Williams Oil Company, completed March 3, 1980.
The RRC has issued 2 drilling permits between 1979 and 1994, permitted to 6,600 ft.
Completion filings report one formation top, including Delaware.
Its 2 leases have reported 15.5K barrels of oil and 64.7K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Midland, TX · P-5 Y, filed Oct 4, 2025 · 177 permits on file · (432) 967-1359
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Williams Oil Company |
| Production reports | Noble Energy Incthrough Aug 2018 |
| Latest permit | Williams Oil CompanyMar 14, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,600
- total depth, ft
- 2
- permits on file
- Mar 14, 1994
- last permit issued
- Mar 3, 1980
- completed
- 15.5K
- cumulative oil, bbl
- 64.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 3, 1980
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pitzer "A" O-10-34119 | Pitzer, N. (Cherry Canyon) | Last Mile Production, LLC | 1 | 15.5K | 62.1K | Mar 1994 – Jul 2026 |
| Pitzer G-10-86670 | Rhoda Walker (Canyon 5900) | Williams Oil Company | 1 | 0 | 2.59K | Jan 1993 – Mar 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Williams Oil CompanyJan 1993 → Aug 1994
- 2Southwest Royalties, Inc.Sep 1994 → Apr 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 421811-99 | Recompletion | Williams Oil Company | Mar 7, 1994 | Mar 14, 1994 | Mar 14, 1994 | 6,600 |
| 63806-99 | Drill | Boyd, Foy Management Corp. | Nov 14, 1979 | Nov 14, 1979 | Dec 15, 1979 | 6,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-86670 | — | — | — | — |
| — | — O-10-34119 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,641 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,063 | 5,073 | Perforated |
| 6,253 | 6,262 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,100 | 12.75 | 975 S |
| 2.375 | 6,150 | — | — |
| 4.5 | 6,600 | 7.875 | 630 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 19, 1994 | Mar 23, 1994 | Yes |
| 00 | Apr 11, 1994 | — | — |
| 00 | Jan 12, 1984 | Mar 18, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-31985 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-31985 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47531985, documented in the API reference.