WELL · 42-475-32157 · DISTRICT 8

East Vermejo #1

Y

Ward County · Vermejo E. (Atoka) field · Temp Abandoned  · Sidetrack

East Vermejo #1 (API 42-475-32157) is a well in Ward County operated by Jay Management Company LLC, completed January 28, 2000 and listed as temp abandoned on the RRC schedule.

The RRC has issued 2 drilling permits between 1980 and 1999, permitted to 19,600 ft.

It was permitted by Platinum Exploration Inc. and has since transferred to Jay Management Company LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Lamar, Bell Canyon, Cherry Canyon, Bone Spring.

No lease production has been reported under this well’s leases.

Operator of record

Jay Management Company LLC

Permitted by Platinum Exploration Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · 26 permits on file · (713) 417-6530

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJay Management Company LLC
Production reportsJay Management Company, LLCthrough Nov 2023
Latest permitPlatinum Exploration Inc.Aug 6, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

19,600
total depth, ft
2
permits on file
Aug 6, 1999
last permit issued
Jan 28, 2000
completed
0
cumulative oil, bbl
4.25M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 28, 2000
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
East Vermejo G-10-96337Vermejo, E. (Atoka)Jay Management Company, LLC104.25MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Platinum Exploration Inc.Jan 2000 → Feb 2006
  2. 2Five States Operating CompanyMar 2006 → Feb 2007
  3. 3Jay Management Company, LLCMar 2007 → Nov 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
486202-99Recompletion · sidetrackPlatinum Exploration Inc.Jul 28, 1999Aug 6, 1999Sep 21, 199919,500
86046-99DrillEnergy Reserves Group, Inc.Jul 9, 1980Jul 9, 1980Nov 2, 198019,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-96337————

Formation tops

As filed on W-2/G-1. Subsea from 2,696 ft elevation.Download CSV →

FormationMD ftSubsea
LamarLAMAR LIME4,685-1,989
Bell Canyon4,717-2,021
Cherry Canyon5,851-3,155
Bone SpringBONE SPRINGS8,149-5,453
Wolfcamp10,615-7,919

Perforations

Perforated and open-hole intervals.

FromToType
16,79416,844Perforated
16,80218,806Perforated
16,85016,852Perforated
16,86016,841Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3754,85717.54,350 S
5.510,4638.5200 S
9.62511,49412.254,145 S
2.87516,650——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 23, 2001Mar 21, 2000Yes
00Jan 12, 1984Dec 3, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47532157, documented in the API reference.