WELL · 42-475-32170 · DISTRICT 8

Monroe -B- #3A

Plugged

Ward County · Payton field  · Vertical

Monroe -B- #3A (API 42-475-32170) is a plugged well in Ward County, plugged April 5, 2006, last operated by Stanolind Operating Corp..

The RRC has issued one drilling permit, issued August 18, 1980, permitted to 2,400 ft.

It was permitted by Henderson & Erickson and has since transferred to Stanolind Operating Corp. on the wellbore schedule.

Completion filings report one formation top, including Yates.

Its lease has reported 157 barrels of oil and 21 mcf of gas since January 1993, last reporting in March 2007. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Stanolind Operating Corp.

Permitted by Henderson & Erickson; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Mar 5, 2010 · 32 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStanolind Operating Corp.
Production reportsThree-B Oil Company, Thethrough Aug 2001
Latest permitHenderson & EricksonAug 18, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,400
total depth, ft
1
permits on file
Aug 18, 1980
last permit issued
Mar 10, 2000
completed
157
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2007

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 10, 2000
Shut in
—
Plugged
Apr 5, 2006

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Monroe -B- O-10-4686PaytonStanolind Operating Corp.215721Jan 1993 – Mar 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Kennedy & TreadawayJan 1993 → Oct 1994
  2. 2Treadaway Oil Co.Jan 1996 → Jan 1996
  3. 3Three-B Oil Company, TheFeb 2000 → Aug 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
90115-99DrillHenderson & EricksonAug 18, 1980Aug 18, 1980—2,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-4686————

Formation tops

As filed on W-2/G-1. Subsea from 2,432 ft elevation.Download CSV →

FormationMD ftSubsea
Yates2,024408

Perforations

Perforated and open-hole intervals.

FromToType
2,0242,036Perforated
2,0542,145Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516011125 S
22,150——
4.52,1976.75250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 20, 2000Mar 27, 2000—
00Jan 12, 1984Dec 1, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
83K
bbl, all reported
Jul 2006
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000089548H-1 InjectionPlugged Apr 13, 20066001,0002,054–2,145

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120052006

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47532170, documented in the API reference.