WELL · 42-475-33021 · DISTRICT 8

Roach -A- #9

Y

Ward County · Ward South field · Injection  · Vertical

Roach -A- #9 (API 42-475-33021) is a well in Ward County operated by Walbet Inc., completed June 21, 1984 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued September 6, 1983, permitted to 2,600 ft.

It was permitted by Graham, Bill J. Estate and has since transferred to Walbet Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Santa Rosa, Tansill, Yates.

Its lease has reported 56.3K barrels of oil and 43.5K mcf of gas since January 1993, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 19.7K barrels injected in the 12 months reported through July 2025.

Operator of record

Walbet Inc.

Permitted by Graham, Bill J. Estate; the EWA schedule now lists a different operator.

Monahans, TX · P-5 Y, filed Mar 4, 2026 · 1 permits on file · (432) 425-2292

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWalbet Inc.
Production reportsWalbet, Inc.through Apr 2026
Latest permitGraham, Bill J. EstateSep 6, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,600
total depth, ft
1
permits on file
Sep 6, 1983
last permit issued
Jun 21, 1984
completed
56.3K
cumulative oil, bbl
43.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 21, 1984
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Roach -A- O-10-28753Ward, SouthWalbet, Inc.756.3K43.5KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 324 · prior 12 210(+54%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Graham, Bill J. Oil & Gas Corp.Jan 1993 → Mar 1993
  2. 2WalbetApr 1993 → Dec 1993
  3. 3Walbet, Inc.Jan 1994 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
209947-99DrillGraham, Bill J. EstateAug 25, 1983Sep 6, 1983May 24, 19842,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-28753————

Formation tops

As filed on W-2/G-1. Subsea from 2,881 ft elevation.Download CSV →

FormationMD ftSubsea
Santa Rosa8082,073
Tansill2,078803
Yates2,373508

Perforations

Perforated and open-hole intervals.

FromToType
2,3812,641Perforated
2,6022,641Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62593912.25300 S
4.52,6907.875175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 2, 1993Jun 21, 1993—
00Jul 31, 1984Jul 17, 1984—
00Jul 26, 1984Jul 17, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

19.7K
bbl, last 12 reported months
1.87M
bbl, all reported
Jul 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000077738H-1 InjectionActive8001,0002,381–2,641

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 19,710 · prior 12 14,842(+33%)

01K2K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47533021, documented in the API reference.