WELL · 42-475-33623 · DISTRICT 8

A. B. Gordon (Queen) #3089

N

Ward County · Ward South (Queen Sand) field  · Vertical

A. B. Gordon (Queen) #3089 (API 42-475-33623) is a well in Ward County operated by MR Oil Company, completed July 1, 1985.

The RRC has issued one drilling permit, issued April 26, 1985, permitted to 3,100 ft.

Completion filings report 2 formation tops, including Yates, Queen.

Its lease has reported 842K barrels of oil and 36.3K mcf of gas since January 1993, last reporting in July 2026. The lease carries 67 wells, so these are lease totals, not this well alone.

Operator of record

Mr Oil Company

Monahans, TX · P-5 Y, filed Apr 2, 2004 · 236 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMr Oil Company
Production reportsContango Resources, LLCthrough Nov 2024
Latest permitMr Oil CompanyApr 26, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,100
total depth, ft
1
permits on file
Apr 26, 1985
last permit issued
Jul 1, 1985
completed
842K
cumulative oil, bbl
36.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 1, 1985
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 67 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gordon, A. B. O-10-7233Ward, SouthCrescent Energy Operating, LLC67842K36.3KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 10(-100%)

0510202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mr Oil CompanyJan 1993 → Jul 2004
  2. 2Stanolind Operating Corp.Aug 2004 → Apr 2008
  3. 3Eagle Rock Operating Company,llcMay 2008 → Oct 2015
  4. 4Vanguard Operating, LLCNov 2015 → Aug 2019
  5. 5Grizzly OP of Delaware, LLCSep 2019 → Jan 2021
  6. 6Contango Resources, Inc.Feb 2021 → Feb 2021
  7. 7Contango Resources, LLCNov 2024 → Nov 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
273785-99DrillMr Oil CompanyApr 25, 1985Apr 26, 1985Jun 6, 19853,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-7233————
—— O-10-7233————

Formation tops

As filed on W-2/G-1. Subsea from 2,521 ft elevation.Download CSV →

FormationMD ftSubsea
Yates2,236285
Queen2,584-63

Perforations

Perforated and open-hole intervals.

FromToType
2,6452,936Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62560511300 S
5.53,0147.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 26, 1996Apr 18, 1996—
00Sep 18, 1991Aug 8, 1991—
00Aug 22, 1991Jul 26, 1985—
00Oct 4, 1989Jul 26, 1985—
00Sep 23, 1989——
00Aug 8, 1985Jul 26, 1985—
00Aug 3, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
169K
bbl, all reported
Jul 1996
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000075308H-1 InjectionCanceled Jan 16, 19973001,3002,645–2,936

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119951996

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47533623, documented in the API reference.