WELL · 42-475-33866 · DISTRICT 8

Walling & Costley -A- #3

Plugged

Ward County · Ward South field  · Vertical

Walling & Costley -A- #3 (API 42-475-33866) is a plugged well in Ward County, plugged August 6, 1996, last operated by Hailstone Resources LLC.

The RRC has issued one drilling permit, issued February 3, 1988, permitted to 2,700 ft.

It was permitted by Sunset Energy Of Texas, Inc. and has since transferred to Hailstone Resources LLC on the wellbore schedule.

Its 2 leases have reported 17.7K barrels of oil and 2.4K mcf of gas since January 1993, last reporting in July 2026. The leases carry 17 wells, so these are lease totals, not this well alone.

Operator of record

Hailstone Resources LLC

Permitted by Sunset Energy of Texas, Inc.; the EWA schedule now lists a different operator.

Argyle, TX · P-5 Y, filed Nov 6, 2020 · (940) 231-8042

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHailstone Resources LLC
Production reportsRecovery Operating LPthrough Apr 2026
Latest permitSunset Energy of Texas, Inc.Feb 3, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,700
total depth, ft
1
permits on file
Feb 3, 1988
last permit issued
Mar 12, 1988
completed
17.7K
cumulative oil, bbl
2.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 12, 1988
Shut in
—
Plugged
Aug 6, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 17 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Walling & Costley -A- O-10-34571Ward, SouthHailstone Resources, LLC717.7K2.4KMay 1995 – Jul 2026
Walling & Costley -A- O-10-7219Ward, SouthAssociated Operating & Explor.1000Jan 1993 – Aug 2003

Oil, barrels lease total

Last 12 months 42 · prior 12 65(-35%)

051015202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jag Oil CompanySep 1995 → Dec 1995
  2. 2Martin, Jimmy IncJan 1996 → Oct 1996
  3. 3Ham Oil & Gas, Inc.Nov 1996 → Dec 1998
  4. 4Fisher Oil Co.Apr 1999 → Mar 2014
  5. 5D & V Oil Co., LPApr 2014 → Jan 2019
  6. 6Recovery Operating LPFeb 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
342059-99DrillSunset Energy of Texas, Inc.Jan 29, 1988Feb 3, 1988—2,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-7219————
—— O-10-34571————

Perforations

Perforated and open-hole intervals.

FromToType
2,3092,518Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62590112.25500 S
4.52,6957.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 29, 1995May 12, 1988—
00Aug 21, 1995May 12, 1988—
00Jun 10, 1988May 12, 1988—
00Jun 3, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
5.7K
bbl, all reported
Jun 1994
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000066577H-1 InjectionPlugged Aug 23, 19968005002,309–2,518

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

011994

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47533866, documented in the API reference.