WELL · 42-475-33869 · DISTRICT 8
Berry One #6
Ward County · Ward South field · Vertical
Berry One #6 (API 42-475-33869) is a well in Ward County operated by Hailstone Resources LLC, completed February 25, 1988.
The RRC has issued one drilling permit, issued February 10, 1988, permitted to 2,800 ft.
It was permitted by Sunset Energy Of Texas, Inc. and has since transferred to Hailstone Resources LLC on the wellbore schedule.
Completion filings report one formation top, including Yates.
Its lease has reported 29.7K barrels of oil and 24.3K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Sunset Energy of Texas, Inc.; the EWA schedule now lists a different operator.
Argyle, TX · P-5 Y, filed Nov 6, 2020 · (940) 231-8042
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hailstone Resources LLC |
| Production reports | Recovery Operating LPthrough Apr 2026 |
| Latest permit | Sunset Energy of Texas, Inc.Feb 10, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,800
- total depth, ft
- 1
- permits on file
- Feb 10, 1988
- last permit issued
- Feb 25, 1988
- completed
- 29.7K
- cumulative oil, bbl
- 24.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 25, 1988
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Berry O-10-32119 | Ward, South | Hailstone Resources, LLC | 2 | 29.7K | 24.3K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 581 · prior 12 1,438(-60%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Associated Operating & Explor.Jan 1993 → Apr 1993
- 2Viola Prod., Inc.May 1993 → Nov 1995
- 3Fisher Oil Co.Dec 1995 → Mar 2014
- 4D & V Oil Co., LPApr 2014 → Jan 2019
- 5Recovery Operating LPFeb 2019 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 342298-99 | Drill | Sunset Energy of Texas, Inc. | Feb 5, 1988 | Feb 10, 1988 | — | 2,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-32119 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 222 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yates | 2,294 | -2,072 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,306 | 2,511 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 635 | 12.25 | 475 S |
| 4.5 | 2,752 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 8, 1989 | Mar 14, 1988 | Yes |
| 00 | Feb 1, 1989 | — | — |
| 00 | Apr 1, 1988 | Mar 14, 1988 | Yes |
| 00 | Mar 24, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-33869 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-33869 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47533869, documented in the API reference.