WELL · 42-475-34147 · DISTRICT 8

Sealy 59 #193

Plugged

Ward County · Magnolia Sealy field  · Vertical

Sealy 59 #193 (API 42-475-34147) is a plugged well in Ward County, plugged September 11, 2019, last operated by Westover Production CO. LLC.

The RRC has issued one drilling permit, issued February 25, 1993, permitted to 3,300 ft.

It was permitted by Stevens & Tull, Inc. and has since transferred to Westover Production CO. LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Tansil, T/Yates.

Its lease has reported 27.8K barrels of oil and 15.9K mcf of gas since August 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Westover Production Co. LLC

Permitted by Stevens & Tull, Inc.; the EWA schedule now lists a different operator.

Kermit, TX · P-5 Y, filed Feb 4, 2026 · (432) 448-2667

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWestover Production Co. LLC
Production reportsQuantum Resources Management,llcthrough May 2013
Latest permitStevens & Tull, Inc.Feb 25, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,300
total depth, ft
1
permits on file
Feb 25, 1993
last permit issued
Aug 26, 1993
completed
27.8K
cumulative oil, bbl
15.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 26, 1993
Shut in
—
Plugged
Sep 11, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sealy 59 O-10-33934Magnolia SealyWestover Production Co., LLC227.8K15.9KAug 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Stevens & Tull, Inc.Aug 1993 → Mar 1995
  2. 2Parker & Parsley Development L.PApr 1995 → Aug 1997
  3. 3Pioneer Natural Res. USA, Inc.Sep 1997 → Jun 1999
  4. 4Prize Operating CompanyJul 1999 → Mar 2002
  5. 5Gruy Petroleum Management Co.Apr 2002 → Apr 2006
  6. 6Cimarex Energy Co. of ColoradoMay 2006 → Nov 2006
  7. 7Quantum Resources Management,llcDec 2006 → May 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
409225-99DrillStevens & Tull, Inc.Feb 22, 1993Feb 25, 1993Aug 9, 19933,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-33934————
—— O-10-33934————

Formation tops

As filed on W-2/G-1. Subsea from 2,646 ft elevation.Download CSV →

FormationMD ftSubsea
Tansil2,60442
T/Yates2,770-124

Perforations

Perforated and open-hole intervals.

FromToType
2,7712,869Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,19512.25750 S
5.53,0217.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 8, 1996Sep 2, 1993Yes
00Sep 21, 1993Sep 2, 1993Yes
00Sep 10, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47534147, documented in the API reference.