WELL · 42-475-34262 · DISTRICT 8

Caprito 98 #6

Plugged

Ward County · R.O.C. (Cherry Canyon) field  · Vertical

Caprito 98 #6 (API 42-475-34262) is a plugged well in Ward County, plugged November 11, 2020, last operated by Abraxas Petroleum Corporation.

The RRC has issued 2 drilling permits (amended once) between 1995 and 1997, permitted to 7,200 ft.

Completion filings report 4 formation tops, including Delaware, Lamar, Cherry Canyon, Brushy Canyon.

Its 3 leases have reported 844K barrels of oil and 6.54M mcf of gas since February 1995, last reporting in July 2026. The leases carry 27 wells, so these are lease totals, not this well alone.

Operator of record

Abraxas Petroleum Corporation

San Antonio, TX · P-5 Y, filed Oct 4, 2025 · 582 permits on file · (800) 321-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAbraxas Petroleum Corporation
Production reportsAbraxas Petroleum Corporationthrough Aug 2024
Latest permitAbraxas Petroleum CorporationJul 24, 1997
7,200
total depth, ft
3
permits on file
Jul 24, 1997
last permit issued
Nov 15, 1995
completed
844K
cumulative oil, bbl
6.54M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 15, 1995
Shut in
—
Plugged
Nov 11, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 27 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Caprito 98 O-10-34903Abraxas (Cherry Canyon)Abraxas Petroleum Corporation17634K5.65MApr 1996 – Jul 2026
Caprito 98 O-10-35698R.O.C. (Bell Canyon)Abraxas Petroleum Corporation2126K496KAug 1997 – Jan 2026
Caprito 98 O-10-34425R.O.C. (Cherry Canyon)Abraxas Petroleum Corporation884.6K389KFeb 1995 – Jun 1996

Oil, barrels lease total

Last 12 months 0 · prior 12 280(-100%)

0100200202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 341(-100%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Abraxas Production CorporationFeb 1995 → Jan 1996
  2. 2Abraxas Petroleum CorporationFeb 1996 → Aug 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
465395-98RecompletionAbraxas Petroleum CorporationNov 20, 1997Jul 24, 1997Jun 16, 19977,200
465395-99RecompletionAbraxas Petroleum CorporationJul 24, 1997Jul 24, 1997—7,200
439042-99DrillAbraxas Production CorporationAug 17, 1995Aug 18, 1995Oct 2, 19957,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-34425————
—— O-10-34903————
—— O-10-35698————

Formation tops

As filed on W-2/G-1. Subsea from 2,655 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware4,782-2,127
Lamar4,826-2,171
Lamar4,828-2,173
Cherry Canyon5,680-3,025
Brushy Canyon6,846-4,191
Brushy Canyon6,848-4,193

Perforations

Perforated and open-hole intervals.

FromToType
4,8624,872Perforated
6,7906,810Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,57512.25825 S
5.57,1207.875695 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 14, 1998Dec 4, 1997Yes
00Apr 29, 1998——
00May 14, 1996Dec 15, 1995Yes
00Jan 16, 1996Dec 15, 1995Yes
00Jan 8, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47534262, documented in the API reference.