WELL · 42-475-34295 · DISTRICT 8

Sealy 42 #E 1

N

Ward County · Magnolia Sealy field  · Vertical

Sealy 42 #E 1 (API 42-475-34295) is a well in Ward County operated by Parker & Parsley Development L.P, completed December 1, 1995.

The RRC has issued one drilling permit, issued November 7, 1995, permitted to 3,100 ft.

Completion filings report 2 formation tops, including Tansil, Yates.

Its 2 leases have reported 1.13M barrels of oil and 1.06M mcf of gas since January 1993, last reporting in July 2026. The leases carry 159 wells, so these are lease totals, not this well alone.

Operator of record

Parker & Parsley Development L.P

Midland, TX · P-5 Y, filed Jun 20, 2003 · 1,422 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleParker & Parsley Development L.P
Production reportsWestover Production Co., LLCthrough Mar 2026
Latest permitParker & Parsley Development L.PNov 7, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,100
total depth, ft
1
permits on file
Nov 7, 1995
last permit issued
Dec 1, 1995
completed
1.13M
cumulative oil, bbl
1.06M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 1, 1995
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 159 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mag-Sealy (Yates) Unit O-10-34970Magnolia SealyWestover Production Co., LLC961.02M773KJul 1996 – Jul 2026
Sealy 42 O-10-32849Magnolia SealyParker & Parsley Development L.P63112K292KJan 1993 – Sep 1996

Oil, barrels lease total

Last 12 months 10,400 · prior 12 10,834(-4%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Stevens & Tull, Inc.Jan 1993 → Mar 1995
  2. 2Parker & Parsley Development L.PApr 1995 → Aug 1997
  3. 3Pioneer Natural Res. USA, Inc.Sep 1997 → Jun 1999
  4. 4Prize Operating CompanyJul 1999 → Mar 2002
  5. 5Gruy Petroleum Management Co.Apr 2002 → Apr 2006
  6. 6Cimarex Energy Co. of ColoradoMay 2006 → Nov 2006
  7. 7Quantum Resources Management,llcDec 2006 → Dec 2014
  8. 8Breitburn Operating L.P.Jan 2015 → Dec 2018
  9. 9Westover Production Co., LLCJan 2019 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
440825-99DrillParker & Parsley Development L.POct 12, 1995Nov 7, 1995Nov 16, 19953,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-32849————
—— O-10-34970————

Formation tops

As filed on W-2/G-1. Subsea from 2,650 ft elevation.Download CSV →

FormationMD ftSubsea
Tansil2,56486
Yates2,722-72

Perforations

Perforated and open-hole intervals.

FromToType
2,7272,890Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,19212.25800 S
5.52,9657.8751,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 19, 1996Jan 8, 1996Yes
00Feb 16, 1996Jan 8, 1996Yes
00Jan 24, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47534295, documented in the API reference.