WELL · 42-475-34390 · DISTRICT 8

China Lake 205 #2

Plugged

Ward County · Quito (Atoka) field  · Vertical

China Lake 205 #2 (API 42-475-34390) is a plugged well in Ward County, plugged April 25, 2022, last operated by Platinum Exploration Inc..

The RRC has issued 3 drilling permits between 1996 and 2001, permitted to 17,300 ft.

Completion filings report 7 formation tops, including Delaware, Manzonita, Bone Sprg, Bone Spring.

Operator of record

Platinum Exploration Inc.

Midland, TX · P-5 Y, filed Oct 4, 2025 · 84 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePlatinum Exploration Inc.
Production reportsPlatinum Exploration Inc.through Jan 2003
Latest permitPlatinum Exploration Inc.Aug 10, 2001
17,300
total depth, ft
3
permits on file
Aug 10, 2001
last permit issued
Aug 31, 1999
completed
0
cumulative oil, bbl
2.52M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1997 THROUGH Apr 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 31, 1999
Shut in
—
Plugged
Apr 25, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
China Lake "205" G-10-185261Burkholder (Fusselman)Platinum Exploration Inc.10407KFeb 2001 – Apr 2022
China Lake "205" G-10-176767Quito (Atoka)Platinum Exploration Inc.104.3KAug 1999 – Feb 2001
China Lake 205 G-10-163715Burkholder (Fusselman)Enron Oil & Gas Company102.11MJan 1997 – Aug 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyJan 1997 → Jul 1999
  2. 2EOG Resources, Inc.Feb 2000 → Dec 2000
  3. 3Platinum Exploration Inc.Jan 2001 → Jan 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
512405-99RecompletionPlatinum Exploration Inc.Aug 9, 2001Aug 10, 2001Jan 15, 200116,867
487690-99RecompletionEnron Oil & Gas CompanySep 17, 1999Sep 23, 1999Jul 27, 199916,867
450362-99DrillEnron Oil & Gas CompanyJul 15, 1996Jul 19, 1996Aug 5, 199617,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-163715————
—— G-10-176767————
—— G-10-185261————

Formation tops

As filed on W-2/G-1. Subsea from 2,548 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware4,685-2,137
Manzonita5,897-3,349
Bone Sprg8,204-5,656
Bone Spring8,204-5,656
MississippianMISS.15,782-13,234
MississippianMISSISSIPPI15,782-13,234
Mississippian15,782-13,234
Devonian16,502-13,954
Devonian16,520-13,972
Fusselman16,814-14,266

Perforations

Perforated and open-hole intervals.

FromToType
14,27614,904Perforated
16,81616,843Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37585017.5810 S
9.6254,69012.252,850 S
7.62511,4758.375650 S
7.62511,4758.75650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 28, 2001Oct 16, 2001Yes
00Nov 6, 2001——
00Aug 16, 2000Feb 22, 2000Yes
00May 11, 2000——
00Apr 30, 1998Mar 9, 1998—
00Aug 22, 1997May 8, 1997Yes
00Aug 5, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47534390, documented in the API reference.