WELL · 42-475-34561 · DISTRICT 8

Best Brine #1

Plugged

Ward County · Monahans N. (Queen) field  · Vertical

Best Brine #1 (API 42-475-34561) is a plugged well in Ward County, plugged November 11, 2009, last operated by Cwo Inc..

The RRC has issued one drilling permit, issued April 6, 1998, permitted to 2,000 ft.

It was permitted by White, Cecil and has since transferred to Cwo Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Santa Rosa, Salado.

Operator of record

Cwo Inc.

Permitted by White, Cecil; the EWA schedule now lists a different operator.

Monahans, TX · P-5 Y, filed Apr 4, 2026 · (432) 631-2317

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCwo Inc.
Production reportsnone
Latest permitWhite, CecilApr 6, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
Apr 6, 1998
last permit issued
Sep 8, 1998
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 8, 1998
Shut in
—
Plugged
Nov 11, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Best Brine O-10-35917Monahans, N. (Queen)Cwo, Inc.300Dec 1998 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
475012-99DrillWhite, CecilApr 3, 1998Apr 6, 1998Jun 8, 19982,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-35917————

Formation tops

As filed on W-2/G-1. Subsea from 12 ft elevation.Download CSV →

FormationMD ftSubsea
Santa RosaSANTA ROSA AQUIFER500-488
Salado1,940-1,928

Perforations

Perforated and open-hole intervals.

FromToType
1,0201,940Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62551212.25250 S
71,0208.75165 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 28, 1999Sep 17, 1998—
00Dec 28, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000091642UIC PermitPlugged Nov 18, 20094904751,020–1,940

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47534561, documented in the API reference.