WELL · 42-475-34833 · DISTRICT 8
Caprito 83 #12
Ward County · Abraxas (Cherry Canyon) field · Shut IN · Vertical
Caprito 83 #12 (API 42-475-34833) is a well in Ward County operated by Abraxas Petroleum Corporation, completed February 23, 2007 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued December 9, 2004, permitted to 6,900 ft.
Completion filings report 3 formation tops, including Bell Canyon, Cherry Canyon, Brushy Canyon.
Its lease has reported 533K barrels of oil and 3.35M mcf of gas since July 1996, last reporting in July 2026. The lease carries 20 wells, so these are lease totals, not this well alone.
Operator of record
San Antonio, TX · P-5 Y, filed Oct 4, 2025 · 582 permits on file · (800) 321-2000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Abraxas Petroleum Corporation |
| Production reports | Abraxas Petroleum Corporationthrough Apr 2022 |
| Latest permit | Abraxas Petroleum CorporationDec 9, 2004 |
- 6,900
- total depth, ft
- 2
- permits on file
- Dec 9, 2004
- last permit issued
- Feb 23, 2007
- completed
- 533K
- cumulative oil, bbl
- 3.35M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 23, 2007
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 20 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Caprito 83 O-10-35061 | Abraxas (Cherry Canyon) | Abraxas Petroleum Corporation | 20 | 533K | 3.35M | Jul 1996 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Abraxas Petroleum CorporationJul 1996 → Apr 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 553706-98 | Drill | Abraxas Petroleum Corporation | Dec 6, 2006 | Dec 9, 2004 | Dec 28, 2006 | 6,900 |
| 553706-99 | Drill | Abraxas Petroleum Corporation | Nov 16, 2004 | Dec 9, 2004 | Dec 28, 2006 | 6,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-35061 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,666 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bell Canyon | 4,713 | -2,047 |
| Cherry Canyon | 5,615 | -2,949 |
| Brushy Canyon | 6,780 | -4,114 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,720 | 4,750 | Perforated |
| 6,689 | 6,768 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,886 | 12.25 | 1,350 S |
| 5.5 | 6,723 | 7.875 | 680 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 19, 2008 | Apr 16, 2007 | Yes |
| 00 | Jun 2, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-34833 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-34833 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47534833, documented in the API reference.