WELL · 42-475-35520 · DISTRICT 8

Shell #14

Y

Ward County · Collie (Delaware) field · Shut IN  · Vertical

Shell #14 (API 42-475-35520) is a well in Ward County operated by Jetta Operating Company Inc., completed December 31, 2015 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued December 14, 2009, permitted to 6,800 ft.

It was permitted by Oxy USA Inc. and has since transferred to Jetta Operating Company Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Lamar, Lamr, Mnzn_2_base, Manzanita Base.

Its lease has reported 2.22M barrels of oil and 4.68M mcf of gas since January 1993, last reporting in July 2026. The lease carries 21 wells, so these are lease totals, not this well alone.

Operator of record

Jetta Operating Company Inc.

Permitted by OXY USA Inc.; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Apr 4, 2026 · 605 permits on file · (817) 312-8504

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJetta Operating Company Inc.
Production reportsJetta Operating Company, Inc.through Apr 2026
Latest permitOXY USA Inc.Dec 14, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,800
total depth, ft
1
permits on file
Dec 14, 2009
last permit issued
Dec 31, 2015
completed
2.22M
cumulative oil, bbl
4.68M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 31, 2015
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 21 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Shell O-10-28362Collie (Delaware)Jetta Operating Company, Inc.212.22M4.68MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 76,760 · prior 12 81,744(-6%)

05K10K202420252026

Gas, mcf lease total

Last 12 months 335,599 · prior 12 327,758(+2%)

020K40K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bennett, M. Brad Inc.Jan 1993 → May 2005
  2. 2Latigo Petroleum Texas, LPJun 2005 → Feb 2008
  3. 3OXY USA Inc.Mar 2008 → Aug 2021
  4. 4Jetta Operating Company, Inc.Sep 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
688571-99DrillOXY USA Inc.Dec 11, 2009Dec 14, 2009Jan 14, 20106,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-28362————

Formation tops

As filed on W-2/G-1. Subsea from 2,558 ft elevation.Download CSV →

FormationMD ftSubsea
Lamar4,715-2,157
Lamr4,715-2,157
MNZN_2_BASE5,993-3,435
Manzanita Base5,994-3,436
Parasequence CC56,064-3,506
Cherry Canyon6,065-3,507

Perforations

Perforated and open-hole intervals.

FromToType
4,7626,168Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,16012.251,060 S
5.56,3638.75450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 18, 2017Aug 23, 2017—
00Oct 28, 2013Dec 3, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47535520, documented in the API reference.