WELL · 42-475-36011 · DISTRICT 8

Stella Jane SWD #1

WaterY

Ward County · Twofreds (Delaware) field · Injection  · Vertical

Stella Jane Swd #1 (API 42-475-36011) is a well in Ward County operated by Layne Swd LLC, completed May 16, 2013 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued March 5, 2012, permitted to 6,800 ft.

It was permitted by Devon Energy Production CO, L.P. and has since transferred to Layne Swd LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Lamar, Bell Canyon, Cherry Canyon.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 3.54M barrels injected in the 12 months reported through April 2026.

Operator of record

Layne SWD LLC

Permitted by Devon Energy Production Co, L.P.; the EWA schedule now lists a different operator.

The Woodlands, TX · P-5 Y, filed Sep 4, 2025 · 5 permits on file · (833) 811-6200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLayne SWD LLC
Production reportsnone
Latest permitDevon Energy Production Co, L.P.Mar 5, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,800
total depth, ft
2
permits on file
Mar 5, 2012
last permit issued
May 16, 2013
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 16, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stella Jane SWD O-10-45092Twofreds (Delaware)Layne SWD, LLC100May 2013 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
734417-98DrillDevon Energy Production Co, L.P.May 24, 2012Mar 5, 2012May 16, 20126,800
734417-99DrillDevon Energy Production Co, L.P.Feb 22, 2012Mar 5, 2012—6,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-45092————

Formation tops

As filed on W-2/G-1. Subsea from 2,707 ft elevation.Download CSV →

FormationMD ftSubsea
Lamar4,704-1,997
Bell Canyon4,732-2,025
Cherry Canyon5,694-2,987

Perforations

Perforated and open-hole intervals.

FromToType
5,3626,406Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,09117.5950 S
9.6254,73012.251,290 S
76,8108.75500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 8, 2019Mar 22, 2019—
00Sep 17, 2014Apr 14, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

3.54M
bbl, last 12 reported months
13.8M
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000105010H-1 InjectionActive40,0002,6755,350–6,420

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 3,536,835 · prior 12 3,925,353(-10%)

0200K400K600K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47536011, documented in the API reference.