WELL · 42-475-36206 · DISTRICT 8
Zoller 34-113 #1
Ward County · Rhoda Walker (Canyon 5900) field · Vertical
Zoller 34-113 #1 (API 42-475-36206) is a well in Ward County operated by Rattler Midstream Operating LLC, completed March 6, 2013.
The RRC has issued one drilling permit, issued August 17, 2012, permitted to 6,850 ft.
It was permitted by Energen Resources Corporation and has since transferred to Rattler Midstream Operating LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Bell Canyon, Cherry Canyon.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 192K barrels injected in the 12 months reported through July 2025.
Operator of record
Rattler Midstream Operating LLC
Permitted by Energen Resources Corporation; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Aug 4, 2025 · 14 permits on file · (855) 247-5920
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rattler Midstream Operating LLC |
| Production reports | none |
| Latest permit | Energen Resources CorporationAug 17, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,850
- total depth, ft
- 1
- permits on file
- Aug 17, 2012
- last permit issued
- Mar 6, 2013
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 6, 2013
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Zoller 34-113 O-10-43267 | Rhoda Walker (Canyon 5900) | Rattler Midstream Operating LLC | 2 | 0 | 0 | Dec 2012 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 746238-99 | Drill | Energen Resources Corporation | Aug 9, 2012 | Aug 17, 2012 | Feb 8, 2013 | 6,850 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-43267 | — | — | — | — |
| — | — O-10-43267 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,699 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bell Canyon | 5,146 | -2,447 |
| Cherry Canyon | 6,043 | -3,344 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,522 | 6,562 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,305 | 11 | 900 S |
| 5.5 | 6,622 | 7.875 | 1,020 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 8, 2015 | Feb 26, 2015 | — |
| 00 | Oct 23, 2013 | Apr 25, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-36206 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-36206 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 192K
- bbl, last 12 reported months
- 10.3M
- bbl, all reported
- Jul 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000106115 | H-1 Injection | Active | 20,000 | 2,525 | 5,150–6,750 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 192,192 · prior 12 587,846(-67%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47536206, documented in the API reference.