WELL · 42-477-30478 · DISTRICT 3

Clay Creek East Unit #1005

N

Washington County · Clay Creek field  · Vertical

Clay Creek East Unit #1005 (API 42-477-30478) is a well in Washington County operated by Hyperion Oil & Gas LLC, completed March 1, 1992.

The RRC has issued one drilling permit, issued May 28, 1982, permitted to 3,500 ft.

It was permitted by Sun Exploration & Production CO. and has since transferred to Hyperion Oil & Gas LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Queen City, Wilcox.

Its 2 leases have reported 994K barrels of oil and 455K mcf of gas since January 1993, last reporting in July 2026. The leases carry 67 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 468K barrels injected in the 12 months reported through May 2025.

Operator of record

Hyperion Oil & Gas LLC

Permitted by Sun Exploration & Production Co.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Mar 4, 2026 · 50 permits on file · (214) 750-3825

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHyperion Oil & Gas LLC
Production reportsHyperion Oil & Gas LLCthrough Apr 2026
Latest permitSun Exploration & Production Co.May 28, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,500
total depth, ft
1
permits on file
May 28, 1982
last permit issued
Mar 1, 1992
completed
994K
cumulative oil, bbl
455K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 1, 1992
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 67 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Clay Creek East Unit O-3-9434Clay CreekHyperion Oil & Gas LLC66994K455KJan 1993 – Jul 2026
Clay Creek East Unit O-3-22736Clay CreekHyperion Oil & Gas LLC100Jul 1995 – Jul 2026

Oil, barrels lease total

Last 12 months 34,871 · prior 12 34,286(+2%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 15,350 · prior 12 15,350(+0%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hyperion Energy, L PJan 1993 → May 2014
  2. 2Hyperion Oil & Gas LLCJun 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
163143-99DrillSun Exploration & Production Co.May 28, 1982May 28, 1982—3,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-9434————
—— O-3-22736————

Formation tops

As filed on W-2/G-1. Subsea from 270 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City1,200-930
Wilcox2,000-1,730

Perforations

Perforated and open-hole intervals.

FromToType
2,4133,133Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7562314.75615 S
3.52,214——
5.52,3906165 S
72,4139.875550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 17, 1995Jun 5, 1992—
00Jun 26, 1992Jun 5, 1992—
00Jan 12, 1984Jul 15, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

468K
bbl, last 12 reported months
21.4M
bbl, all reported
May 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000045443W-14 DisposalActive15,0001,2002,413–3,133

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 468,269 · prior 12 395,663(+18%)

020K40K60K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47730478, documented in the API reference.