WELL · 42-477-30517 · DISTRICT 3

Clay Creek East Unit #521

Plugged

Washington County · Clay Creek field  · Vertical

Clay Creek East Unit #521 (API 42-477-30517) is a plugged well in Washington County, plugged July 15, 1999, last operated by Hyperion Oil & Gas LLC.

The RRC has issued one drilling permit, issued August 9, 1983, permitted to 2,000 ft.

It was permitted by Sun Expl. & Prod. CO.-Corpus and has since transferred to Hyperion Oil & Gas LLC on the wellbore schedule.

Completion filings report one formation top, including Clay Creek.

Its lease has reported 994K barrels of oil and 455K mcf of gas since January 1993, last reporting in July 2026. The lease carries 66 wells, so these are lease totals, not this well alone.

Operator of record

Hyperion Oil & Gas LLC

Permitted by Sun Expl. & Prod. Co.-Corpus; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Mar 4, 2026 · 50 permits on file · (214) 750-3825

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHyperion Oil & Gas LLC
Production reportsHyperion Oil & Gas LLCthrough Apr 2026
Latest permitSun Expl. & Prod. Co.-CorpusAug 9, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
Aug 9, 1983
last permit issued
Jul 5, 1984
completed
994K
cumulative oil, bbl
455K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 5, 1984
Shut in
—
Plugged
Jul 15, 1999

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 66 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Clay Creek East Unit O-3-9434Clay CreekHyperion Oil & Gas LLC66994K455KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 34,871 · prior 12 34,286(+2%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 15,350 · prior 12 15,350(+0%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hyperion Energy, L PJan 1993 → May 2014
  2. 2Hyperion Oil & Gas LLCJun 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
204874-99DrillSun Expl. & Prod. Co.-CorpusAug 9, 1983Aug 9, 1983Sep 26, 19832,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-9434————

Formation tops

As filed on W-2/G-1. Subsea from 290 ft elevation.Download CSV →

FormationMD ftSubsea
Clay Creek922-632

Perforations

Perforated and open-hole intervals.

FromToType
9221,146Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62541612.25280 S
5.51,8087.875380 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 29, 1984Oct 11, 1984—
00Nov 15, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

3.1K
bbl, last 12 reported months
577K
bbl, all reported
May 1999
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000052022H-1 InjectionPlugged Jul 26, 19993,000460922–1,146

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 3,102 · prior 12 6,475(-52%)

05001K1.5K19981999

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47730517, documented in the API reference.