WELL · 42-477-30569 · DISTRICT 3

Clay Creek #1H

Plugged

Washington County · Giddings (Austin Chalk Gas) field  · Horizontal · Sidetrack

Clay Creek #1H (API 42-477-30569) is a plugged horizontal well in Washington County, plugged June 1, 2011, last operated by Enervest Operating L.L.C..

The RRC has issued 3 drilling permits between 1984 and 2001, permitted to 16,500 ft.

It was permitted by Emerald Operating Company, Inc. and has since transferred to Enervest Operating L.L.C. on the wellbore schedule.

Completion filings report 6 formation tops, including Navarro, Pecan Gap, Austin Chalk, Eagle Ford.

Operator of record

Enervest Operating L.L.C.

Permitted by Emerald Operating Company, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Oct 4, 2025 · 1,249 permits on file · (713) 659-3500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnervest Operating L.L.C.
Production reportsEnervest Operating, L.L.C.through May 2011
Latest permitEmerald Operating Company, Inc.Jul 27, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

16,500
total depth, ft
3
permits on file
Jul 27, 2001
last permit issued
Nov 13, 2001
completed
0
cumulative oil, bbl
2.62M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 13, 2001
Shut in
—
Plugged
Jun 1, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Clay Creek G-3-151424Giddings (Austin Chalk, Gas)Enervest Operating, L.L.C.102.62MAug 1994 – May 2011
Wolff, David G-3-112925Clay, N.E. (Georgetown)Sanders, Larry E. Trustee100Jan 1993 – Aug 1994

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sanders, Larry E. TrusteeAug 1994 → May 2001
  2. 2Emerald Operating Company, Inc.Jun 2001 → Aug 2008
  3. 3Enervest Operating, L.L.C.Sep 2008 → May 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
511919-99Recompletion · sidetrackEmerald Operating Company, Inc.Jul 27, 2001Jul 27, 2001Jul 29, 200112,300
424255-99RecompletionSanders, Larry E. TrusteeMay 25, 1994May 25, 1994May 28, 199416,500
242522-99DrillWilliams, Clayton W., Jr.Sep 19, 1984Jun 20, 1984Jun 30, 198413,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-112925————
—— G-3-151424————

Formation tops

As filed on W-2/G-1. Subsea from 196 ft elevation.Download CSV →

FormationMD ftSubsea
Navarro9,081-8,885
Pecan Gap10,853-10,657
Austin Chalk11,862-11,666
Austin Chalk11,863-11,667
Eagle FordEAGLEFORD12,222-12,026
Buda12,440-12,244
Georgetown12,525-12,329

Perforations

Perforated and open-hole intervals.

FromToType
11,92514,274Perforated
11,94614,454Perforated
12,21612,225Perforated
12,52812,604Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,36012.25900 S
7.62510,1929.875690 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 20, 2003Dec 20, 2001Yes
00Dec 6, 1994Sep 12, 1994Yes
00Oct 27, 1994——
00Nov 7, 1984Oct 10, 1984—
00Oct 17, 1984Sep 13, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47730569, documented in the API reference.